Northern Natural Gas Company
Fifth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 02/21/2009, Docket: RP01-223-004, Status: Effective
Fourth Revised Sheet No. 261 Fourth Revised Sheet No. 261 : Pending
Superseding: Substitute Third Revised Sheet No. 261
GENERAL TERMS AND CONDITIONS
To the extent that capacity remains, Northern shall
schedule TI, TF overrun, TFX overrun, VFT overrun, and LFT
overrun on the basis of the nominated TI, TF overrun, TFX
overrun, VFT overrun, and LFT overrun commodity path rate.
For the purpose of allocating capacity, shippers willing
to pay more than the maximum tariff rate will be
considered to be paying the maximum tariff rate.
Provided however, for purposes of determining scheduling
priority, such nominated commodity rate shall include the
associated upstream or downstream path rate for
transactions nominating a pooling point.