Northern Natural Gas Company

Fifth Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 02/21/2009, Docket: RP01-223-004, Status: Effective

Fourth Revised Sheet No. 261 Fourth Revised Sheet No. 261 : Pending

Superseding: Substitute Third Revised Sheet No. 261

 

 

 

GENERAL TERMS AND CONDITIONS

 

To the extent that capacity remains, Northern shall

schedule TI, TF overrun, TFX overrun, VFT overrun, and LFT

overrun on the basis of the nominated TI, TF overrun, TFX

overrun, VFT overrun, and LFT overrun commodity path rate.

For the purpose of allocating capacity, shippers willing

to pay more than the maximum tariff rate will be

considered to be paying the maximum tariff rate.

 

Provided however, for purposes of determining scheduling

priority, such nominated commodity rate shall include the

associated upstream or downstream path rate for

transactions nominating a pooling point.