Northern Natural Gas Company
Fifth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 09/29/2010, Docket: RP10-1109-000, Status: Effective
Third Revised Sheet No. 259A Third Revised Sheet No. 259A
Superseding: Second Revised Sheet No. 259A
GENERAL TERMS AND CONDITIONS
formula. The load forecast formula will be based on the latest available forecasted
temperatures at 8:00 a.m. the day before gas flow, using the National Ocean and Atmospheric
Administration (NOAA) weather forecasting service. The forecasted volume will be based on
three years of historical daily volume flows recorded in Northern's Gas Volume Allocation
(GVA) system at the non-telemetered points at the forecasted temperature based on the
season, month and day of the week. Northern and Shipper may agree to adjust the formula to
equal the MDQ for verifiable changes to the historical daily volume flows. The formula is
as follows:
Forecasted volume = Intercept + Feb + Mar + Apr + May + Jun + Jul + Aug
+ Sep + Oct + Nov + Dec + Season + Year + Holiday + Mon + Tues + Weds + Thurs
+ Fri + Sat + Temp + Temp2 + Lag High + 7 Day Avg Temp
Each point is mapped to the closest weather station where daily forecasts can be
identified. The Shipper and Northern will review and agree to the load forecast formula
results prior to committing to the program. Northern and Shipper may agree to use a
different load forecast formula, subject to Northern filing such formula with the
Commission.
Standards for Operational Zone Boundary Changes. Shipper may request a change in the
currently effective Operational Zone boundaries or may request that a delivery point(s) be
moved from one Operational Zone to another. Such request shall be made in writing and
shall set forth the name of the Shipper, the delivery point(s) involved, and the reasons
for requesting the change or move.
a. Northern shall evaluate any such request using the following requirements:
i. Shipper has had delivery point(s) in the Operational Zone to which Shipper has
requested the delivery point(s) be changed or moved for a period of at least twelve
(12) consecutive months;
ii. circumstances at the particular delivery point(s) that Shipper desires to change or
move have changed from those existing at the time the existing boundaries were
established, e.g., a change in ownership of the delivery point(s); a change in the
size of the load at the delivery point(s); or an intervening change in Northern's
tariff which, in conjunction with the change or move in delivery point(s), would
simplify Shipper's nomination process; and
iii. the change will not result in negative operational consequences or other system
management problems for Northern or other shippers. As part of the assessment of the
operational and system management consequences of the requested change, Northern
shall perform a flow study, based on the three most recent scheduling allocations in
the Operational Zone in which the delivery point(s) specified in the Shipper's
request currently are located, demonstrating how those allocations would have been
affected had the delivery point(s) not been in that Operational Zone at the time of
the allocations. To the extent Northern demonstrates that increased allocations,
SOL, SUL or Critical Days or other operational or system management impacts will
occur as a result of the change, the request will be denied.
b. If Northern determines that the requirements set forth in subsection a. have been met,
Northern shall make a Section 4 tariff filing requesting Commission approval to make the
proposed change or move. No such change or move shall be made until Commission approval
has been obtained.
c. If the request is granted and negative operational or other adverse consequences result,
Northern has the right to make a filing with the Commission to (1) restore the
Operational Zone boundaries that existed prior to the change, or (2) return the delivery
point(s) to the original Operational Zone. Pending the outcome of the filing before the
Commission, Northern has the right to take interim actions that address the negative
operational impact or other adverse consequences. Such interim actions include, but are
not limited to, the actions set forth in c(1) and c(2) above.