Northern Natural Gas Company
Fifth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/17/2000, Docket: RP09-455-000, Status: Pending
Original Sheet No. 257A Original Sheet No. 257A
GENERAL TERMS AND CONDITIONS
The Timely and Evening Nomination Cycles pertain to transportation for the
upcoming gas day. The Intraday 1 and Intraday 2 Nomination Cycles pertain to
the current gas day. Together the Timely, Evening, Intraday 1 and Intraday 2
Nomination Cycles shall be referred to as the grid-wide synchronization
times. Northern will process nominations in addition to the grid-wide
synchronization times subject to the additional Intraday nomination
subsection herein, and accordingly Northern is not required to hold capacity
for grid-wide nominations until a standard nomination cycle. However,
Northern, on a best-efforts basis, will make capacity available at an allocated
group in an amount equal to the primary to primary firm entitlement that was cut
during the Timely cycle due to inadvertent mismatches between the upstream or
downstream quantity, location, contract number, or DUNS number. Capacity will not
be made available at specific receipt or delivery points (including pipeline
interconnects). The capacity that will be made available will be associated only
with the takeaway from Demarc Pool and Ventura Pool and from the Demarc deferred,
Ogden deferred and Ventura deferred delivery points. If a mismatch occurs in a
pool that is not linked directly to a transportation nomination (i.e. pooling
transactions), Northern will not make such capacity available. Capacity will only
be made available for corrections to be made in the subsequent Evening cycle.
Further, Northern will make available up to 50,000 Dth/day for the first two gas
days of the month, and up to 25,000 Dth/day for the remainder of the month, unless
Northern posts a lower limit on its website. Such capacity will be allocated
pro-rata during the Evening cycle. Bumping will only be permitted during the
Evening and Intraday 1 Nomination Cycles.