52/ For the period 11/01/2008 through 10/31/2018, for the contract MDQ, Shipper shall pay a total monthly

reservation charge equal to $0.4330/Dth multiplied by the contract MDQ multiplied by 30.4. In addition,

Shipper shall pay a commodity rate equal to the maximum rate provided in Northern's FERC Gas Tariff as

amended from time to time. These rates include the applicable Annual Charge Adjustment and electric

compression charges.

 

In addition to the above rate(s), Shipper shall pay any applicable fuel use and unaccounted for.

 

The negotiated rate stated above is applicable to all receipt and delivery points in Northern's Market Area;

provided, however, if the negotiated rate becomes less than the annual average of the maximum rates set

forth in Northern's FERC Gas Tariff, such rate would be applicable only to the receipt and delivery points

listed below. If any other points are used either on a primary or alternate basis, the negotiated rate will

not be applicable and the annual average of the applicable maximum rates will apply for the entire contract

during the month that any points not listed below are used.

 

Primary Receipt Point: NBPL/NNG Welcome Primary Delivery Point: Galva Ethanol Plant

 

Alternate Receipt Point: Ogden Deferred Delivery Alternate Delivery Point: Ogden Deferred Delivery

 

In addition to the above rates, Shipper shall pay (i) the FERC approved Carlton surcharge and (ii) all FERC

approved surcharges that are made effective after the effective date of this Amendment and applicable to the

service provided hereunder.

 

53/ For the period 11/01/2008 through 10/31/2013, Shipper shall pay a negotiated reservation rate for

3,600 DTH/day of winter entitlement equal to the winter maximum reservation rate as revised from time to

time plus capital of $0.6651 DTH/day (currently the reservation rate would be equal to $1.1636/Dth/day).

 

In addition, Shipper shall pay a commodity rate equal to the maximum rate provided in Northern's FERC Gas

Tariff. This rate includes the applicable Annual Charge Adjustment and electric compression charges.

 

In addition to the above rates, Shipper shall provide any applicable fuel use and unaccounted-for, and pay

any applicable FERC-approved reservation and commodity surcharges.