Northern Natural Gas Company
Fifth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/01/2010, Docket: RP10-354-000, Status: Effective
83 Revised Sheet No. 53 83 Revised Sheet No. 53
Superseding: 82 Revised Sheet No. 53
Commodity
Charges
----------
Nov-Oct
-------
GS-T COMMODITY THROUGHPUT RATE
Market Area 0.7049 1/ 6/
Field to Demarcation 0.6396
Field-to-Market 1.2606 1/ 6/
STAND ALONE COMPRESSION
Ft. Buford
Maximum 0.2619 1/ 2/ 6/
Minimum 0.0125 1/ 2/ 6/
RATE SCHEDULE CS-1
Compression Fee (Exhibit A Volumes)
Maximum 0.0401
Minimum 0.0054
Compression Fee (Additional Volumes)
Maximum 0.0401
Minimum 0.0054
BEAVER COMPRESSION FEE
Incidental Jurisdictional Compression Fee 0.0400
WATERVILLE STORAGE
The Market Area transportation rate, fuel and unaccounted for is charged for delivery
to Waterville storage point (POI 922), or other similarly situated third party storage
points in the Market Area. If redelivery from Waterville, or other similarly situated
third party storage points, is to a Market Area point, there are no additional
transportation, fuel or unaccounted for charges. If the redelivery is to a Field Area
delivery point, the Field Area mileage/MID transportation rate and fuel is charged.
CAPACITY RELEASE FEE (Rate per transaction)
Marketing Negotiated 3/
DAILY DELIVERY VARIANCE CHARGE:
Positive DDVC 1.0000 7/
Positive/Critical DDVC
-First 2% 15.0000
-Next 3% 22.0000
Negative DDVC 0.4000 7/
Punitive DDVC 4/ 7/
Punitive/Critical DDVC
-Level I 56.5000
-Level II 113.0000
AUTHORIZED OVERRUN
TF, TFX, LFT, TI and GS-T Rate Schedules 5/
1/ Includes ACA of $0.0019.
2/ Rate only applies to interruptible volumes transported through Ft. Buford
that are not ultimately confirmed for redelivery into Northern's Market Area
system.
3/ Northern will assess fee only in those instances outlined in Sheet No. 288.
4/ Charge equal to five (5) times the SMS monthly reservation fee.
5/ The Authorized Overrun Rate shall be equal to the TI rate for the applicable
MID path shown in Sheet Nos. 59-60A.
6/ Reflects Market Area Electric Compression Surcharge of $0.0006 and Field
Area Electric Compression charge of $0.0000 where applicable.
7/ On non-SOL/SUL/Critical Days the rate will be the maximum November-March
Market Area TI Rate during the November-March period, and the maximum
April-October Market Area TI Rate during the April-October period.