Northern Border Pipeline Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/01/2003, Docket: RP00-403-004, Status: Effective
Substitute First Revised Sheet No. 260B Substitute First Revised Sheet No. 260B : Effective
Superseding: Original Sheet No. 260B
GENERAL TERMS AND CONDITIONS
10. NOMINATIONS/CONFIRMATIONS/SCHEDULING/INTERRUPTION OF SERVICE
(Continued)
10.6 Interruption of Service (Continued)
10.63 Service Reduction Due to an Operational Flow Order
(Continued)
(c) Action Taken by Company Prior to Issuance of OFO
Company shall first attempt to isolate the impact
of the operational problem by utilizing an OBA(s)
at or in the area of Company's system where the
problem is occurring. However, if the cumulative
operational imbalance(s) related to such OBA(s)
exceeds the cumulative imbalance tolerance level
agreed to by Company and the Interconnected
Party(ies), and neither the Interconnected
Party(ies) or the related Shippers are actively
addressing the problem, Company shall then issue
an OFO watch for such location. In the event
there is no agreed upon cumulative imbalance
tolerance level, then the cumulative imbalance
tolerance level shall be 10% of the Historical
Flow Quantity at such point.
Affected parties shall be directly notified of
the issuance of an OFO watch.
An OFO watch will state a period of time
affected Shipper(s) have to address such
condition with the Interconnected Party(ies)
and/or prepare alternative arrangements in the
event an OFO is issued.
(d) Issuance of OFO
If Company determines that the operational
problem detailed in the OFO watch has not been
adequately addressed within the time period
specified in such watch, Company shall then have
the right to issue an OFO.