Northern Border Pipeline Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 09/08/2004, Docket: RP04-451-000, Status: Effective
Third Revised Sheet No. 260A Third Revised Sheet No. 260A : Effective
Superseding: Second Revised Sheet No. 260A
GENERAL TERMS AND CONDITIONS
10. NOMINATIONS/CONFIRMATIONS/SCHEDULING/INTERRUPTION OF SERVICE
(Continued)
10.6 Interruption of Service (Continued)
10.63 Service Reduction Due to an Operational Flow Order
(Continued)
(ii) The receipt of gas that does not conform
to Company's quality standards, as
specified in Subsection 5.1 of the
General Terms and Conditions.
(iii) The receipt of gas that does not conform
to the maximum and minimum temperatures
as specified in Subsections 2.3 and 2.4
of the General Terms and Conditions.
(iv) Shippers utilizing a pressure controlled
point on Company's system who fail to
adjust their nominated quantities within
a Gas Day to reflect the actual load
pattern, plus or minus the mutually
agreed upon and posted tolerance level
for such location. In the event there is
no mutually agreed upon tolerance level,
then the tolerance level shall be 5% of
Historical Flow Quantity at such point.
(b) Applicability of OFO
Company shall make an OFO as localized as is
reasonably practicable based on Company's
reasonable judgment concerning the situations
requiring remediation. Furthermore, Company
will tailor the OFO to match the severity of the
known or anticipated operational problem
requiring remediation.