Northern Border Pipeline Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 02/01/2009, Docket: RP09-132-000, Status: Effective
Ninth Revised Sheet No. 249 Ninth Revised Sheet No. 249
Superseding: Substitute Eighth Revised Sheet No. 249
GENERAL TERMS AND CONDITIONS
10. NOMINATIONS/CONFIRMATIONS/SCHEDULING/INTERRUPTION OF SERVICE
(Continued)
10.3 Nomination Validation
Company shall validate all nominations once they are
received. Such validation will include verifying the
nomination elements that are part of the Quick Response,
verifying the existence of Agreements and amendments, and
verifying that credit worthiness has been established to
provide such nominated service.
A Nomination which cannot be validated shall be voided by
Company.
10.4 Capacity Allocation and Confirmation Process
To effectuate the confirmation of the Company's pipeline,
point, and compression service capacity on a non-discriminatory
basis, when a constraint exists, Company shall utilize
Subsections 10.41, 10.42 and 10.43 to allocate nominated
quantities of gas.
A nomination line item that has 1) its Point of Receipt and
its Point of Delivery within the Transportation Path and
2) its nominated flow direction is in the Transportation
Path direction shall be referred to as an In-Path,
In-Direction (IPID) nomination line item.
A nomination line item that has 1) its Point of Receipt
and/or its Point of Delivery outside the Transportation
Path and 2) its nomination flow direction is in the
Transportation Path direction shall be referred to as an
Out-of-Path, In-Direction (OPID) nomination line item.
A nomination line item that has 1) its Point of Receipt and
its Point of Delivery within the Transportation Path and
2) its nominated flow direction is opposite of the
Transportation Path direction shall be referred to as an
In-Path, Out-of-Direction (IPOD) nomination line item.
A nomination line item that has 1) its Point of Receipt
and/or its Point of Delivery outside of the Transportation
Path and 2) its nomination flow direction is opposite of the
Transportation Path direction shall be referred to as an
Out-of-Path, Out-of-Direction (OPOD) nomination line item.