Northern Border Pipeline Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 09/01/2005, Docket: RP05-392-001, Status: Effective
Substitute Third Revised Sheet No. 211A Substitute Third Revised Sheet No. 211A : Effective
Superseding: Substitute Second Revised Sheet No. 211A
GENERAL TERMS AND CONDITIONS
1. DEFINITIONS (Continued)
o The term "Historical Flow Quantity" (HFQ) for a given Point
of Interconnection shall be the lesser of the average daily
scheduled quantity for the previous 15 consecutive Gas Days
or the actual average daily metered flow quantity for such
time period.
o The term "Information Postings" shall mean the common
information, which would include the five required postings
under Standard 4.3.6. [4.2.1]
o The term "In-Direction" shall mean a nomination line item
that has a nominated flow direction in the same direction as
the contractual Transportation Path.
o The term "Interconnected Party" shall mean the Person who is
directly connected to Company's facilities at a physical
Point of Receipt or a physical Point of Delivery.
o The term "IT-1 Shippers" shall mean at any time the Shippers
which have entered into IT-1 Transportation Agreements with
Company which are then in effect; and the term IT-1 Shipper
shall mean one of such Persons.
o The term "IT-1 Transportation Agreement" shall mean at any
time with respect to any IT-1 Shipper, an executed IT-1
Transportation Agreement for service under this Tariff made
by and between Company and such IT-1 Shipper which is then in
effect.