Northern Border Pipeline Company

First Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 04/01/2004, Docket: RP04-205-000, Status: Effective

Original Sheet No. 196 Original Sheet No. 196 : Effective

 

 

RATE SCHEDULE TPB

THIRD PARTY BALANCING SERVICE

 

 

2. APPLICABILITY AND CHARACTER OF SERVICE (Continued)

 

2.2 Character of Service (Continued)

 

2.26 Responsibility of Balancing Provider (Continued)

 

Company shall monitor the instantaneous flow

activity at the Variable Load Point on a real time

basis. If a change in such instantaneous flow does

occur, Company shall notify the Balancing Provider,

by phone, and shall adjust the instantaneous flow

rates at the physical point(s) of interconnection

that are designated to take swing quantities of gas.

 

2.27 Company's Right to Flow Control

 

If the quantity of gas available at the Balanced

Point is less than the quantity of gas being

delivered to the Variable Load Point, Company

reserves the right under this Rate Schedule to place

the Variable Load Point on flow control such that

the gas available at the Balanced Point is equal to

the gas being provided to the Variable Load Point

Customer.

 

3. RATES AND PAYMENTS

 

3.1 Rates

 

The daily Maximum and Minimum Rates for services under this

Rate Schedule are listed on the Statement of Rates in

Company's FERC Gas Tariff.

 

Company may elect to provide service at a rate that is less

than the Maximum Rate, but no less than the Minimum Rate

applicable to this Rate Schedule. However, Company is not

obligated to offer to provide service at any rate less than

the Maximum Rate.