North Baja Pipeline, LLC
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 08/12/2002, Docket: RP02-363-008, Status: Effective
Original Sheet No. 152A Original Sheet No. 152A : Effective
GENERAL TERMS AND CONDITIONS OF SERVICE
(Continued)
16. BALANCING (Continued)
16.1 (Continued)
(c) Actual confirmed receipt quantity exceeds actual delivered
quantity
A net positive imbalance shall exist if the difference
between the quantity received (nominated, scheduled, and
confirmed) and the quantity delivered, taking into account
the reduction in quantity for compressor fuel use, yields a
positive result. Commencing upon notification by NBP of the
existence of the imbalance, and to the extent that the NBP
system is not constrained or its integrity is not threatened
and NBP has not issued an Operational Flow Order, Shipper
shall have three (3) days to correct the imbalance.
(Continued)