Mojave Pipeline Company
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/03/2010, Docket: RP10-706-000, Status: Effective
First Revised Sheet No. 257 First Revised Sheet No. 257
Superseding: Original Sheet No. 257
GENERAL TERMS AND CONDITIONS
(Continued)
20. Electronic Bulletin Board (Continued)
20.3 Accuracy of Information: Transporter shall use reasonable efforts
to ensure the accuracy of information presented on the electronic
bulletin board; however, Transporter makes no representation or
warranty of any kind to any person concerning the use of
Transporter's electronic bulletin board, including, without
limitation, the accuracy of any posted information, and shall not
be liable to any person for any damages, including without
limitation any special, incidental, or consequential damages which
may arise in connection with Transporter's posting of information
on the electronic bulletin board, or as a result of any person's
use, abuse or misuse of Transporter's electronic bulletin board.
20.4 Shippers desiring to exchange information using Transporter's
designated Internet site must first enter into an agreement
conforming to the NAESB Model Trading Partner Agreement.
20.5 EBB users shall have access to all the information specifically
identified in FERC Order Nos. 497, 636, 637 and 717. EBB access,
including historical data, shall be available to state regulatory
commissions and state consumer advocates on the same basis as any
other party. Mojave shall maintain backup copies of the data
contained on its EBB for three years, which may be archived to off-
line storage. Parties may access the on-line data directly through
the EBB. In the event the data has been archived off-line, parties
may request the data from Passport Services through Passport's
electronic mail service, and such data shall be made available for
downloading on user's computer. EBB users shall be allowed to
download files so their contents can be reviewed in detail without
tying up access to the EBB. Information on the most recent
transactions shall be listed before older information. EBB users
shall be able to split large files into smaller parts for ease of
use. On-line help shall be available to assist the EBB users along
with a search function allowing users to locate all information
concerning a specific transaction, and menus that permit users to
separately access offers to release capacity, capacity available
directly from the pipeline, and standards of conduct information.
20.6 Transporter's currently effective Second Revised Volume No. 1
Tariff, as revised from time to time, is posted on Mojave's EBB.
Therefore, Mojave shall provide paper copies of the effective
tariff to customers and interested state commissions only when
specifically requested.