First Revised Sheet No. 245A First Revised Sheet No. 245A
Superseding: Original Sheet No. 245A
General Terms and Conditions
(Continued)
11. System Operational Parameters (Continued)
(b) If the condition(s) continue to exist after the Alert has
been in effect for one intraday scheduling cycle, Transporter
may post on its EBB a notice making the Critical Period
effective. Transporter agrees to provide as much advance
notice as possible but, at a minimum, will give Shippers at
least one intraday scheduling cycle to adjust quantities to
meet the requirements of the Alert. The Critical Period
shall be limited to the smallest area of the system so that
the fewest number of Shippers are affected.
(c) Transporter will post on its EBB, as soon as available,
information about the status of the operational variables
described above that determine when the Critical Period will
begin and end. Transporter will lift the Critical Period when
it determines that such conditions no longer threaten the
system integrity of the pipeline.
(d) While the Critical Period is in effect, an Unauthorized
Overrun Gas charge will be assessed on those quantities
defined in Sections 11 and 10 of Rate Schedules FT-1 and IT-
1, respectively.
(e) Transporter will post information on its EBB after the
Critical Period is lifted that provides information on the
factors that caused the Critical Period to be issued and then
lifted.
11.4 Transporter's Policy on Delivery Laterals: Transporter shall
construct, replace, or recondition laterals (at its own expense) to
comply with contractual commitments, or to conform to Department of
Transportation Regulations or other safety related requirements.
Transporter shall also construct laterals, as requested by a
Shipper, when that Shipper has agreed to reimburse Transporter for
the construction and related costs. For purposes of this Section
11.4, "laterals" mean any pipeline extension (other than mainline
extension) built from an existing pipeline facility to deliver gas
to one or more customers, including new delivery points and
enlargements or replacements of existing laterals.