Mojave Pipeline Company

Second Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 06/03/2010, Docket: RP10-706-000, Status: Effective

First Revised Sheet No. 245A First Revised Sheet No. 245A

Superseding: Original Sheet No. 245A

 

General Terms and Conditions

(Continued)

 

11. System Operational Parameters (Continued)

 

(b) If the condition(s) continue to exist after the Alert has

been in effect for one intraday scheduling cycle, Transporter

may post on its EBB a notice making the Critical Period

effective. Transporter agrees to provide as much advance

notice as possible but, at a minimum, will give Shippers at

least one intraday scheduling cycle to adjust quantities to

meet the requirements of the Alert. The Critical Period

shall be limited to the smallest area of the system so that

the fewest number of Shippers are affected.

(c) Transporter will post on its EBB, as soon as available,

information about the status of the operational variables

described above that determine when the Critical Period will

begin and end. Transporter will lift the Critical Period when

it determines that such conditions no longer threaten the

system integrity of the pipeline.

(d) While the Critical Period is in effect, an Unauthorized

Overrun Gas charge will be assessed on those quantities

defined in Sections 11 and 10 of Rate Schedules FT-1 and IT-

1, respectively.

(e) Transporter will post information on its EBB after the

Critical Period is lifted that provides information on the

factors that caused the Critical Period to be issued and then

lifted.

 

11.4 Transporter's Policy on Delivery Laterals: Transporter shall

construct, replace, or recondition laterals (at its own expense) to

comply with contractual commitments, or to conform to Department of

Transportation Regulations or other safety related requirements.

Transporter shall also construct laterals, as requested by a

Shipper, when that Shipper has agreed to reimburse Transporter for

the construction and related costs. For purposes of this Section

11.4, "laterals" mean any pipeline extension (other than mainline

extension) built from an existing pipeline facility to deliver gas

to one or more customers, including new delivery points and

enlargements or replacements of existing laterals.