Mojave Pipeline Company
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/03/2010, Docket: RP10-706-000, Status: Effective
Fourth Revised Sheet No. 215 Fourth Revised Sheet No. 215
Superseding: Third Revised Sheet No. 215
GENERAL TERMS AND CONDITIONS
(Continued)
4. Requests for Service (Continued)
(c) If Transporter elects to reserve capacity, it will notify
Shippers of its intent as part of its posting of capacity on
its EBB. Transporter's posting for reserved capacity for
future expansion projects shall include the following
information: (i) a description of the project for which the
capacity will be reserved; (ii) the total quantity of capacity
to be reserved; (iii) the location of the proposed reserved
capacity on the pipeline system; (iv) whether, and if so when,
Transporter anticipates that an open season for the capacity
will be held or the reserved capacity will otherwise be posted
for bids; (v) the projected in-service date of the new
facilities; and (vi) on an ongoing basis, how much of the
reserved capacity has been sold on a limited-term basis that
would otherwise be eligible for a ROFR. To the extent
Transporter has not already solicited turnback capacity, the
posting for reserved capacity shall also include a non-binding
solicitation for turnback capacity to serve the expansion
project, provided that Transporter shall post the non-binding
solicitation for turnback capacity no later than 90 Days after
the close of the expansion project open season. Transporter
shall make reasonable efforts to update the posting up to the
in-service date of the project to reflect any material project
changes.
(d) Transporter will make capacity available through an open
season or an EBB capacity posting before Transporter reserves
such capacity for a future expansion project. If Transporter
elects to hold an open season to make capacity generally
available, Transporter shall have the right to state in the
open season posting minimum terms and conditions for bids that
would be acceptable for consideration that are the same as the
minimum terms and conditions anticipated for the future
expansion project open season. In the event that the
subsequent expansion project open season imposes minimum terms
and conditions that are materially different from the terms
and conditions imposed in the previous capacity open season,
Transporter shall hold another open season for the capacity
that uses the same minimum terms and conditions as were
imposed for the expansion project open season. If the
expansion project open season is held prior to or during the
reservation of capacity open season, Transporter shall use the
same minimum terms and conditions as used for the expansion
project open season.