RATE SCHEDULE FT-1

Firm Transportation Service

(Continued)

 

5. CHARGE (Continued)

 

5.2 Transportation Charge: Shipper shall pay to Transporter a

Transportation Charge for each MMBtu of gas delivered by

Transporter for Shipper which on any day is equal to or less than

the Maximum Daily Demand for such Shipper. The rate per MMBtu

which will apply to all gas transported up to Shipper's Maximum

Daily Demand shall be that rate which has been mutually agreed upon

between Shipper and Transporter as set forth in Exhibit B of the

applicable Service Agreement. Such rate shall not be greater than

the Maximum Transportation Charge nor less than the Minimum

Transportation Charge as set forth on Sheet No. 11 of this Tariff.

 

5.3 Authorized Overrun Charge: Shipper shall pay Transporter for each

MMBtu of Authorized Overrun Gas, as defined in Section 12 of this

Rate Schedule. The rate per MMBtu which will apply to all

Authorized Overrun Gas shall be that rate which has been mutually

agreed upon between Shipper and Transporter as set forth on Exhibit

B of the executed Service Agreement. Such rate shall not be

greater than the Maximum Rate nor less than the Minimum Rate as set

forth on Sheet No. 11 of this Tariff.

 

5.4 Incidental Charges: Shipper shall reimburse Transporter for any

incidental charges incurred by Transporter in providing this

service. Such charges may include but not be limited to reporting

or filing fees, construction or acquisition of new facilities

necessary to render service and any other costs that are directly

attributable to the rendering of service under this Rate Schedule

that may be incurred by Transporter from time to time. Transporter

shall make such filings as may be required by Section 4 and Section

7(c) of the Natural Gas Act and the FERC's Regulations thereunder

as may be necessary to construct and operate such facilities and

recover such charges.