Mojave Pipeline Company
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 03/22/2010, Docket: RP10-330-001, Status: Pending
Thirty-Second Revised Sheet No. 11 Thirty-Second Revised Sheet No. 11
Superseding: Thirty-First Revised Sheet No. 11
STATEMENT OF RATES
(Rates per MMBtu)
Rate 1/
RATE SCHEDULE FT-1
Daily Reservation Fee
Maximum 0.1483
Minimum 0.0000
Transportation Charge
Maximum 0.0054
Minimum 0.0054
RATE SCHEDULE IT-1
Interruptible Transportation Service
Maximum 0.1537
Minimum 0.0054
RATE SCHEDULE PAL
Parking Rate
Maximum 0.1537
Minimum 0.0000
Lending Rate
Maximum 0.1537
Minimum 0.0000
OTHER CHARGES:
Authorized Overrun Charge
Maximum 0.1537
Minimum 0.0054
Imbalance Trading Fee: 2/
Maximum 0.0200
Minimum 0.0000
System Linepack, Fuel,
Collection Volumetric L&U and Other Gas Total
Fuel and L&U 3/ Period True-up Balance Adjustment Retention
Fuel 0.45% 0.01% 0.46%
L&U 0.43% 0.08% 0.08% 0.59%
Fuel Charge 1.05%
1/ Surcharge(s) shall be added as applicable.
Maximum Minimum
ACA $0.0019 $0.0019
2/ Applicable to imbalance trading transactions marketed by Transporter at request of Shipper,
pursuant to Section 20 of the General Terms and Conditions.
3/ See Section 28 of the General Terms and Conditions.