Centerpoint Energy - Mississippi River

Third Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 04/01/2003, Docket: RP00-410-005, Status: Effective

Original Sheet No. 253A Original Sheet No. 253A : Effective

 

GENERAL TERMS AND CONDITIONS

(continued)

 

 

35. SEGMENTATION OF CAPACITY (continued)

 

 

35.2 In addition to MRT's right to determine operational feasibility on

a case-by-case basis, as set out in Section 35.6 below, a purported

segmentation (whether for a Customer's own use or on release) shall not be

operationally feasible if: (a) Pools or Aggregated Delivery Points are

nominated as Segment Receipt Point(s) or Segment Delivery Point(s), absent a

determination by MRT that the proposed segmentation would not result in an

impermissible overlap of capacity or otherwise result in a greater level of

entitlement to line or zone capacity than the entitlement measured by

reference to the Line Priority and Rate Zone Capacity under the original

contract prior to segmentation;