Centerpoint Energy - Mississippi River
Third Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/01/2002, Docket: RP01-622-003, Status: Effective
Second Sub Sixth Revised Sheet No. 249 Second Sub Sixth Revised Sheet No. 249 : Effective
Superseding: Substitute Fifth Revised Sheet No. 249
GENERAL TERMS AND CONDITIONS
(Continued)
29. WAIVERS
29.1 MRT may waive any defaults by any Customer with respect to
performance or compliance with the provisions of the applicable rate schedules
on a basis which is not unduly discriminatory; provided, however, that no
waiver shall operate or be construed as a waiver of any other or further
defaults, whether of a like or different character.
29.2 MRT will assess a zero charge for Fuel Use for transactions that
do not require the use of compression on MRT's system. For each transaction
utilizing the specific receipt and delivery point combinations listed below,
MRT has determined that there will not be fuel used since compression will not
be utilized.
(a) Receipt Point(s):
(1) At the point of interconnect between MRT's Line
A-327 at Station 0+00 located in Stoddard
County, Missouri and Texas Eastern Transmission
Corporation interstate pipeline system.
Delivery Point(s):
(1) The terminus of MRT's Line A-327 at Ralston
Purina's Golden Cat plant located in Stoddard
County, Missouri.
(b) Receipt Point(s):
(1) At the point of interconnection between MRT's East
Line and Natural Gas Pipeline Company of America
("NGPL") at station 1922+34 located in Clinton County,
Illinois and Trunkline Gas Company ("Trunkline") at
station 0+00 located in Clay County, Illinois.
Delivery Point(s):
(1) At the Clay County Trust 2000 delivery point located
on MRT's East Line at station 0+00 in Clay County,
Illinois.
29.3 MRT will assess a separate LUFG for transactions utilizing the
specific receipt and delivery point combinations listed below, because they
do not contribute to system-wide LUFG.