Centerpoint Energy - Mississippi River
Third Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 05/01/1997, Docket: RP97- 73-002, Status: Effective
Second Revised Sheet No. 151 Second Revised Sheet No. 151 : Effective
Superseding: First Revised Sheet No. 151
GENERAL TERMS AND CONDITIONS
(Continued)
10. TRANSPORTATION BALANCING (Continued)
utilizing the point will be credited with the amount of gas scheduled
for receipt or delivery. Any imbalance will be treated as an
imbalance between the interconnecting entity and MRT, in accordance
with the terms of the OBA.
(d) MRT may suspend OBAs during a System Protection Warning,
as set forth in the OBA's terms.
(e) PDA methodologies need not be submitted pursuant to
Section 7.7 of these General Terms and Conditions for points at which
an OBA is in effect.