8. NOMINATIONS, SCHEDULING, AND CURTAILMENT (Continued)
The quick response by MRT will be an electronic message to those parties
submitting nominations electronically advising of receipt of the
nomination and of any errors in communication or missing required data
elements.
(ii) All nominations should be considered original
nominations and should be replaced to be changed. When a
nomination for a date range is received, each day within that
range is considered an original nomination. When a subsequent
nomination is received for one or more days within that range, the
previous nomination is superseded by the subsequent nomination
only to the extent of the days specified. The days of the
previous nomination outside the range of the subsequent nomination
are unaffected. Nominations have a prospective effect only.
(iii) Nominations received after nomination deadline should
be scheduled after the nominations received before the nomination
deadline.
(iv) Incomplete or Late Nominations. A Customer's or Pool
Operator's failure to submit properly completed nominations may
result in gas not being transported, pooled, or injected or
withdrawn from storage. A Customer's or Pool Operator's failure
to submit a nomination by the applicable deadline may result in
delays for the requested service. Late nominations will not be
accepted if such acceptance would result in the curtailment of gas
previously scheduled, unless MRT and all affected parties agree to
the contrary.
(g) Intraday Nominations. Any nomination submitted after the
nomination deadline for the day of gas flow specified in Section
8.1(f)(i)(A) herein shall be treated as an intraday nomination. For
services that provide for intraday nominations and scheduling, there
will be no limitation as to the number of intraday nominations (line
items as per NAESB Standard 1.2.1) which a Customer or Pool Operator may
submit at any one standard nomination cycle or in total across all
nomination cycles. An intraday nomination is effective only for the day
specified in the nomination, must be submitted at least four (4) hours
prior to the requested change in gas flow, and remains in effect through
the end of such day.