Centerpoint Energy - Mississippi River
Third Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/01/2002, Docket: RP03- 51-000, Status: Effective
Second Revised Sheet No. 112A Second Revised Sheet No. 112A : Effective
Superseding: First Revised Sheet No. 112A
GENERAL TERMS AND CONDITIONS
(Continued)
7. CONDITIONS OF RECEIPT AND DELIVERY (Continued)
7.7 Predetermined Allocations - Receipts (Continued)
(h) The same standard allocation methodologies should be
available for use at all points.
(i) The types of allocation methodologies are on a list from
which two parties may agree. If the two parties cannot agree upon an
allocation methodology, pro rata based upon confirmed nominations (that
are scheduled) should be used as the default method. The party
responsible for custody transfer (the party performing the measurement
function) should provide the allocation.
(j) MRT should accept NAESB approved allocation methodology
types from the upstream or downstream custody transfer party who is
providing the point confirmation.
(k) A new allocation detail may be needed when a nomination
changes.
7.8 Preliminary Allocations - Receipts
MRT shall utilize the PDA methodologies in calculating the preliminary
allocations of receipt quantities for Customers. Deviations from the PDA
methodologies provided MRT shall only be allowed if all affected parties and
MRT agree to such alternate allocation order.