Centerpoint Energy - Mississippi River
Third Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/01/2002, Docket: RP01-622-002, Status: Effective
Second Revised Sheet No. 44 Second Revised Sheet No. 44 : Effective
Superseding: First Revised Sheet No. 44
RATE SCHEDULE FSS
FIRM STORAGE SERVICE
(Continued)
7. RATES AND CHARGES (Continued)
(a) Deliverability Charge - a charge per month equal to the
product of the deliverability rate and the Customer's contracted MDWQ;
(b) Capacity Charge - a charge per month calculated by dividing
the product of the capacity rate and the Customer's contracted capacity
by twelve;
(c) Injection Charge - a charge equal to the product of the
injection rate and the total quantities of natural gas injected by MRT
on behalf of the Customer during the billing month;
(d) Withdrawal Charge - a charge equal to the product of the
withdrawal rate and the total quantities of natural gas withdrawn by MRT
on behalf of the Customer during the billing month;
(e) Authorized Overrun Service Charge - a charge equal to the
product of the applicable authorized overrun rate and any authorized
overrun injection or withdrawal quantities permitted by MRT during the
billing month; and
(f) Other Fees and Charges - Other fees, charges, and penalties
which may be assessed as provided by the General Terms and Conditions or
which may be permitted by the Commission.
7.3 Customer shall reimburse MRT in kind for fuel usage and lost or
unaccounted for gas. MRT will retain the applicable Fuel Use and LUFG
Percentages of gas quantities delivered for injection into storage and of gas
volumes withdrawn from storage. The applicable Fuel Use and LUFG Percentages
are set forth on the currently effective Sheet No. 8 of this tariff.