Midwestern Gas Transmission Company

SECOND REVISED VOLUME NO. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 12/01/2000, Docket: RP00-105-000, Status: Effective

Fortieth Revised Sheet No. 8B Fortieth Revised Sheet No. 8B : Superseded

Superseding: Thirty-Ninth Revised Sheet No. 8B

Rates - Cents per MMBtu

 

WESTERN DIVISION TRANSPORTATION

 

Maximum Rates

Including Surcharge

Rate Facility Service Facility Service

Schedule Section Description Charge Charge Charge 4/ Charge

Maximum Minimum Maximum Minimum

 

FTS-WD 4 FIRM TRANSPORTATION 3/

Forward Haul 8.01¢ 0.00¢ 1/ 0.37¢ 2/ 8.67¢ 1/+0.94¢

Backhaul/Exchange 8.01¢ 0.00¢ 1/ 0.00¢ 8.67¢ 1/+0.94¢

 

TCR Reservation Charge and 636 Reservation Charge

to Applicable Shippers pursuant to Section 24

of the General Terms and Conditions 0.00¢

 

GRI Demand Surcharge to Applicable High Load Factor

Shippers pursuant to Section 23 of the General

Terms and Conditions 0.66¢

 

GRI Demand Surcharge to Applicable Low Load Factor

Shippers pursuant to Section 23 of the General

Terms and Conditions 0.40¢

 

GRI Volumetric Surcharge to Applicable Shippers pursuant

to Section 23 of the General Terms and Conditions 0.72¢

 

ACA Surcharge to Applicable Shippers pursuant to

Section 22 of the General Terms and Conditions 0.22¢

 

TCR Usage Surcharge to Applicable Shippers pursuant

to Section 24 of the General Terms and Conditions 0.00¢

 

In addition to any fuel charges by Transporting Pipeline, the

Fuel Reimbursement Charge Percentage for deliveries under

Rate Schedules FTS-WD, FTS-1 and FTS-2 pursuant to Section 27

of the General Terms and Conditions is 0.50% per compressor

station up to a maximum of 2.25%

 

1/ Service Charge applicable to each MMBtu delivered shall be 0.28¢/MMBtu plus .07¢/MMBtu per 25 miles or

any portion thereof in excess of 100 miles.

 

2/ Quantities delivered from an upstream FTS-WD shipper confirmed as receipts by a downstream shipper under

a Western Division Rate Schedule FTS-WD shall not be assessed a Facility Charge, Service

Charge or other surcharges, but shall be assessed a charge equal to .07¢/MMBtu per 25 miles or

any portion thereof.

 

3/ 100% Load Factor Rate shall equal the sum of the Facility and Service Charge.

 

4/ Reflects High Load Factor GRI Demand Surcharge. The maximum Facility Charge for Low Load Factor Shippers

is 8.41¢ per MMBtu.