Midwestern Gas Transmission Company
Third Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 05/10/2010, Docket: RP10-587-000, Status: Pending
Original Sheet No. 59M Original Sheet No. 59M
RATE SCHEDULE FT-D
FIRM TRANSPORTATION SERVICE (Conditional)
(continued)
2. APPLICABILITY AND CHARACTER OF SERVICE (continued)
2.2 Company shall provide southbound service under Rate Schedule FT-D transportation
by means of a turbine compressor engine located at Company's Paris, Illinois
compressor station (together with any replacement engine, the "Paris Turbine").
The Paris Turbine is subject to air emissions restrictions that prevent Company
from operating it more than 6,090 hours during any rolling twelve (12) month
period. FT-D Service is subject to curtailment (an "FT-D Curtailment") when such
interruption is due to a shutdown of the Paris Turbine to avoid exceeding this
operating limit. Any other interruption or curtailment (including those arising
from shutdown of the Paris Turbine for other reasons) of firm service due to
force majeure or otherwise would apply to all affected firm service equally and
would not be an FT-D Curtailment, as defined above.
2.3 Service shall be allocated and scheduled pursuant to Subsections 3.7, 3.8 and
Section 15 of the General Terms and Conditions of Company's FERC Gas Tariff.
However, service may be curtailed pursuant to an FT-D Curtailment or for any of
the reasons set out in Section 10 of the General Terms and Conditions of
Company's FERC Gas Tariff or whenever necessary to maintain gas quality or the
integrity of Company's system.
2.4 To assist Shippers in tracking the potential for FT-D Curtailment, the Company
shall post, on the 15th day of every month, a report on the actual turbine
compressor runtime hours of the preceding eleven month(s).
2.5 Company shall not be required to install, operate or maintain any additional
facilities in order to provide new transportation service under this Rate
Schedule.