Midwestern Gas Transmission Company

Third Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 10/01/2009, Docket: RP09-947-000, Status: Effective

Third Revised Sheet No. 5A Third Revised Sheet No. 5A

Superseding: Second Revised Sheet No. 5A

 

SUMMARY OF RATES AND CHARGES

============================

 

Base Adjustments

Tariff Under Rate After

Rate Schedule and Rate Rate Section 18 GT&C 5/ Adjustments

---------------------------------------- ------- --------------- ------

 

TRANSPORTATION RATES (Per Dekatherms) 1/

=====================================

FT-GS

Maximum $0.1705 $0.0019 $0.1724

Minimum $0.0009 $0.0019 $0.0028

 

IT - Mainline 2/

Maximum $0.0687 $0.0019 $0.0706

Minimum $0.0009 $0.0019 $0.0028

 

IT - Eastern Mainline 2/

Maximum $0.0993 $0.0019 $0.1012

Minimum $0.0000 $0.0019 $0.0019

 

Fuel Retention and Loss Quantity 3/ 1.00%

 

 

PARK AND LOAN RATES (Per Dekatherms)

====================================

PAL - Mainline 4/

Maximum $0.0687

Minimum $0.0000

 

PAL - Eastern Mainline 4/

Maximum $0.0993

Minimum $0.0000

 

 

 

 

1/ Transportation rates apply to forward hauls, backhauls and exchanges.

2/ If an IT Shipper nominates a quantity of gas which includes a Receipt Point or Delivery Point

on the Mainline and a Receipt Point or Delivery Point on the Eastern Mainline, such quantity

of gas shall be subject to the sum of the Rate Schedule IT - Mainline Maximum Rate and the

Rate Schedule IT - Eastern Mainline Maximum Rate, subject to Section 27 of the General Terms

and Conditions of Company's FERC Gas Tariff, in addition to the Fuel Retention and Loss

Quantity.

3/ The Fuel Retention and Loss Quantity applies to all transportation rate schedules except for

service rendered entirely by displacement for which a 0.5 percent Loss Quantity shall apply,

and except for service where both the receipt and delivery points are the same for which no

Fuel Retention and Loss Quantity shall apply and subject to the provisions of Subsection

3.6.9 of the General Terms and Conditions of Company's FERC Gas Tariff.

4/ If a PAL Shipper nominates a quantity of gas which includes a Receipt Point or Delivery Point

on the Mainline and a Receipt Point or Delivery Point on the Eastern Mainline, such quantity

of gas shall be subject to the sum of the Rate Schedule PAL - Mainline Maximum Rate and the

Rate Schedule IT - Eastern Mainline Maximum Rate, subject to Section 27 of the General Terms

and Conditions of Company's FERC Gas Tariff.

5/ Applies only to physical deliveries.