American Midstream (Midla), LLC

Sixth Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 05/01/2010, Docket: RP10-483-000, Status: Effective

Original Sheet No. 28 Original Sheet No. 28

 

(b) For those services involving T-32 Receipt/Delivery Points, Pipeline shall have the

right to retain, from the quantities of Gas delivered to Pipeline, a Fuel Reimbursement

percentage applicable to service on the T-32 lateral ("T-32 Fuel Reimbursement") equal

to the actual fuel and unaccounted for on the T-32 lateral. Until changed in a filing

accepted by the FERC, the T-32 Fuel Reimbursement percentage will be zero. Any

change in such fuel rate shall be made effective only at the beginning of a Month.

 

 

(c) For those services involving Receipt and Delivery Points located entirely on

laterals not contiguous to Pipeline's mainline system, Pipeline shall not retain any Gas as

Fuel Reimbursement.

 

4.3 Customer shall pay Pipeline the Annual Charge Adjustment ("ACA") charge, as set

forth on currently effective Tariff Sheet No. 4.

 

4.4 Any Customer receiving service from Pipeline on May 18, 1992 and having a MDQ

which on that date was less than 2,000 MMBtu per day and which is receiving

transportation service pursuant to this Rate Schedule NNS may elect to pay a cost-

based, one-part, volumetric rate as set forth on currently effective Tariff Sheet No. 4, in

lieu of the rate for NNS service as set forth on currently effective Tariff Sheet No. 4

(hereinafter referred to as the Small Customer Rate Option). A Customer which elects

the Small Customer Rate Option shall be required to schedule and take quantities up to

its MDQ for all firm services before Customer may take any interruptible quantities.

 

4.4 Customer shall also pay Pipeline all other applicable rates, charges and fees as set

forth on currently effective Tariff Sheet No. 4 or as may be assessed, required or

permitted to be charged by the FERC, any regulatory body or court of competent

jurisdiction related to the service provided hereunder.

 

5. GENERAL TERMS AND CONDITIONS

 

All of the General Terms and Conditions of Pipeline's FERC Gas Tariff of which this Rate

Schedule is a part are applicable to this Rate Schedule and are made a part hereof to the

extent that such terms and conditions are not contradicted by any provisions herein.