ANR Pipeline Company

Second Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 08/01/1999, Docket: RP99-357-000, Status: Effective

Third Revised Sheet No. 134 Third Revised Sheet No. 134 : Effective

Superseding: Substitute Second Revised Sheet No. 134

 

GENERAL TERMS AND CONDITIONS

(Continued)

 

Transporter shall allow the operator, if any, at any Receipt Point,

to establish allocation priorities according to the following

procedures:

 

(a) Operator shall notify Transporter via GEMStm after or during

confirmation and before start of the Service Day, that it

desires to establish allocation priorities at Receipt Points

utilizing any of the following methodologies: ranked

percentage, swing, or operator provided value provided,

however, Transporter will not be required to agree to any of

such allocation methodologies if they are operationally or

administratively infeasible.

 

(b) Transporter shall advise such operator of the confirmed

nominations at such Receipt Points.

 

(c) The operator shall establish separate allocation priorities

for over and under production at the level of detail that

the confirmed nominations are provided, and advise

Transporter of such priorities via GEMStm before the

beginning of the Day. Any confirmed nominations that do not

have established allocation priorities shall be considered

as having the highest priority:

 

(1) In the case of underproduction, such allocation

priorities shall be used by Transporter to allocate

Gas, such that Transporter shall allocate Gas to

each Shipper, in order of priority designated by the

operator, up to the full nomination of that Shipper,

until the entire gross measured volume at such

Receipt Point is allocated.

 

(2) In the case of over production, such allocation

priorities shall be used by Transporter to allocate

Gas, such that Transporter shall allocate Gas to

each Shipper, in order of priority designated by the

operator, equal to the full nomination of that

Shipper, with any over produced quantities being

allocated to the Shipper(s) with the lowest

priority, until the entire gross measured volume at

such Receipt Point is allocated.

 

14.3 Simultaneous Receipts and Deliveries. To the extent that both

receipts and deliveries have been nominated at the same meter, then

for any Day: