ANR Pipeline Company

Second Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 03/01/2007, Docket: RP04-435-006, Status: Effective

Original Sheet No. 131.04 Original Sheet No. 131.04 : Effective

 

 

GENERAL TERMS AND CONDITIONS

(Continued)

 

(b) Monitoring Points. Transporter shall utilize the following

Monitoring Points to establish HDP Segments on Transporter's

System for purposes of posting Hydrocarbon Dewpoint limits

per this section 13.3.

 

1. Eunice Headstation East

2. Eunice Headstation West

 

3. Greensburg Headstation East

4. Greensburg Headstation West

 

5. Defiance Station East

6. Defiance Station South

7. Defiance Station North

 

8. Sandwich Station North

9. Sandwich Station South

10. Sandwich Station East

 

11. Georgetown Station

 

(c) Pairing. To the extent operationally feasible, and subject

to the conditions below, Transporter may allow a shipper

whose Gas does not meet a posted Hydrocarbon Dewpoint limit

to pair its Gas with a shipper whose Gas satisfies the

posted specification.

 

(i) A shipper wishing to pair must provide ANR with a

written proposal for the pairing of its volumes

(including but not limited to E-Mail or facsimile).

 

(ii) Upon receipt of a pairing proposal, Transporter will

determine whether the proposal can physically occur

on Transporter's system without causing undue risk to

Transporter's operations.

 

(iii) If Transporter determines that shipper's proposal is

physically possible, then Transporter will evaluate

whether the commingled stream that would result from

the proposal satisfies the Hydrocarbon Dewpoint

limitation.