ANR Pipeline Company
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 03/01/2007, Docket: RP04-435-006, Status: Effective
Fourth Revised Sheet No. 130 Fourth Revised Sheet No. 130 : Effective
Superseding: Third Revised Sheet No. 130
GENERAL TERMS AND CONDITIONS
(Continued)
(a) by means of an instrument of standard manufacture installed
to measure the heating value of the Gas being delivered at
the Receipt Point or the Delivery Point;
(b) at intervals of not more than six (6) Months by means of an
instrument of standard manufacture and a sample of Gas from
the Gas stream from which Gas is being delivered at the
Receipt Point or the Delivery Point; or
(c) other methods mutually agreed upon by both parties.
For the purpose of calculating receipts and deliveries, the heat
content of the Gas so determined at each such point shall be
deemed to remain constant at such point until the next
determination. The unit of quantity for the purpose of
determining total heating value shall be one (1) cubic foot of
anhydrous Gas at a temperature of sixty (60) degrees Fahrenheit
and an absolute pressure of 14.73 psia.
13.2 Freedom from Objectionable Matter. The Gas received and
delivered hereunder:
(a) shall be commercially free from objectionable odors, dust,
water and any other solid or liquid matter which might
interfere with its merchantability or cause injury to or
interference with proper operation of the equipment through
which it flows and any substance that might become
separated from the gas in Transporter's facilities.