ANR Pipeline Company

Second Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 03/01/2007, Docket: RP04-435-006, Status: Effective

Fourth Revised Sheet No. 130 Fourth Revised Sheet No. 130 : Effective

Superseding: Third Revised Sheet No. 130

 

GENERAL TERMS AND CONDITIONS

(Continued)

 

(a) by means of an instrument of standard manufacture installed

to measure the heating value of the Gas being delivered at

the Receipt Point or the Delivery Point;

 

(b) at intervals of not more than six (6) Months by means of an

instrument of standard manufacture and a sample of Gas from

the Gas stream from which Gas is being delivered at the

Receipt Point or the Delivery Point; or

 

(c) other methods mutually agreed upon by both parties.

 

For the purpose of calculating receipts and deliveries, the heat

content of the Gas so determined at each such point shall be

deemed to remain constant at such point until the next

determination. The unit of quantity for the purpose of

determining total heating value shall be one (1) cubic foot of

anhydrous Gas at a temperature of sixty (60) degrees Fahrenheit

and an absolute pressure of 14.73 psia.

 

13.2 Freedom from Objectionable Matter. The Gas received and

delivered hereunder:

 

(a) shall be commercially free from objectionable odors, dust,

water and any other solid or liquid matter which might

interfere with its merchantability or cause injury to or

interference with proper operation of the equipment through

which it flows and any substance that might become

separated from the gas in Transporter's facilities.