ANR Pipeline Company
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 07/05/2010, Docket: RP10-824-000, Status: Effective
Fourth Revised Sheet No. 129 Fourth Revised Sheet No. 129
Superseding: Third Revised Sheet No. 129
GENERAL TERMS AND CONDITIONS
(Continued)
similar conditions when the meter was registering accurately.
12.5 If at any time during the term hereof, a new method or technique
is developed with respect to Gas measurement or the
determination of the factors used in such Gas measurement, such
new method or technique may be substituted upon mutual agreement
thereto by both parties.
12.6 The parties agree to preserve for a period of at least three
(3) years or such longer period as may be required by public
authority, all test data, charts, if any, and other similar
records.
12.7 Shipper or Transporter may install, maintain, and operate
odorizing (at a Delivery Point only), regulating, telemetering,
heating and fogging equipment at its own expense as it shall
desire at each Receipt Point or Delivery Point, and the operator
of such equipment at its own expense shall provide the other
party a suitable site therefor and allow the other party free
access to and use of the site; provided that such equipment
shall be so installed, maintained and operated as not to
interfere with the operation or maintenance of the operating
party's measuring equipment at each Receipt Point or Delivery
Point. All such equipment as Shipper or Transporter shall
desire to install shall be constructed, installed and operated
to conform to the other party's requirements. Shipper or
Transporter may remove any of its equipment installed on such
site at any time.
13. QUALITY
Gas delivered to, and received by, Transporter, shall meet the
following specifications:
13.1 Heat Content. Heat content shall mean the gross heating value
per cubic foot of Gas delivered at each Receipt Point and
Delivery Point. The Gas at each Receipt Point shall have a heat
content not greater than 1200 BTUs per cubic foot nor less than
967 BTUs per cubic foot when determined on a dry basis.
Transporter shall have the right to waive such BTU content
limits if, in Transporter's sole opinion, Transporter is able to
accept Gas with a BTU content outside such limits without
affecting Transporter's operations. The total heating value per
cubic foot of Gas shall be determined at each Receipt Point and
each Delivery Point by one of the following methods: