ANR Pipeline Company
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 11/01/1993, Docket: RS92- 1-005, Status: Effective
Original Sheet No. 127 Original Sheet No. 127 : Superseded
GENERAL TERMS AND CONDITIONS
(Continued)
Gas delivered through a meter, the flowing Gas
temperature for only the period(s) of time that Gas
was flowing through the meter shall be used.
12.3 All flow, measuring, testing and related equipment shall be of
standard manufacture and type approved by Transporter. If
applicable, Transporter or Shipper may install check measuring
equipment and telemetering equipment, provided that such
equipment shall be so installed as not to interfere with the
operations of the operator. Transporter, or Shipper, in the
presence of the other party, shall have access to measuring
equipment at all reasonable times, but the reading,
calibrating, and adjusting thereof and the changing of charts,
if any, shall be done by the operator of the facilities.
Transporter or Shipper shall have the right to be present at
the time of the installing, reading, cleaning, changing,
repairing, inspecting, testing, calibrating or adjusting done
by the operator of the measuring equipment. The records from
such measuring equipment shall remain the property of the
operator, but upon request, the other party may request
records, including charts, if any, together with calculations
therefrom for inspection, subject to return within thirty (30)
Days after receipt thereof. Reasonable care shall be exercised
in the installation, maintenance and operation of the measuring
equipment so as to avoid any inaccuracy in the determination of
the volume of Gas received and delivered.
The accuracy of all measuring equipment shall be verified by
operator at reasonable intervals, and if requested, in the
presence of representatives of the other party, but neither
Transporter nor Shipper shall be required to verify the
accuracy of such equipment more frequently than once in any
thirty (30) Day period. If the operator agrees to verification
and test of measuring equipment and fails to perform such
verification and testing, then the other party shall have the
right to cease or temporarily discontinue service under this
Agreement relative to such measuring equipment. If either
party at any time desires a special test of any measuring
equipment, it will promptly notify the other party and the
parties shall then cooperate to secure a prompt verification of
the accuracy of such equipment. Transportation and related
expenses involved in the testing of meters shall be borne by
the party incurring such expenses, provided, however, that