ANR Pipeline Company
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 02/01/2006, Docket: RP06- 92-001, Status: Effective
Sub Fourth Revised Sheet No. 94A Sub Fourth Revised Sheet No. 94A : Effective
Superseding: Third Revised Sheet No. 94A
GENERAL TERMS AND CONDITIONS
(Continued)
(2) Indicate desired options for Rate Schedules ETS
and FTS-3.
(3) For Storage related Transportation under Rate
Schedules ETS, FTS-1, FTS-2, FTS-4 and FTS-4L,
Transporter may permit a Shipper to have a
Maximum Daily Quantity during the Summer Period
equal to the Base Maximum Daily Injection
Quantity; provided, however, that the only
Primary Delivery Point during such Summer Period
shall be the Point of Injection/Withdrawal and
further, Transporter may permit a Shipper to have
a Maximum Daily Quantity during the Winter Period
equal to Shipper's Base Maximum Daily Withdrawal
Quantity for Rate Schedule FSS provided that the
only Primary Receipt Point during such Winter
Period shall be the Point of
Injection/Withdrawal.