ANR Pipeline Company
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 08/01/2010, Docket: RP10-977-000, Status: Effective
Eighth Revised Sheet No. 49 Eighth Revised Sheet No. 49
Superseding: Seventh Revised Sheet No. 49
RATE SCHEDULE FSS
FIRM STORAGE SERVICE
(Continued)
during the Withdrawal Period or withdraw quantities of Gas for
Shipper on any Day during the Injection Period. Shipper may
request Transporter to accept deliveries of quantities of Gas in
excess of the MSQ during any Injection Period and Shipper may
request Transporter to redeliver quantities of Gas in excess of
the MSQ or Working Storage Gas during any Withdrawal Period
provided, however, that at no time may Shipper's Working Storage
Gas exceed Shipper's MSQ. Transporter may do so on an
interruptible basis if it can do so without adverse effect on
Transporter's operations or its ability to meet all of its other
firm service obligations. Shipper may nominate on an
interruptible basis for the redelivery of any quantities of Gas
which have been provided to Shipper in excess of Working Storage
Gas, in accordance with Section 6 of these General Terms and
Conditions of this Tariff; however, Shipper shall be required to
return all such quantities commencing within forty-eight (48)
hours of notification by Transporter to do so unless Transporter
in its reasonable discretion determines that a longer period is
operationally feasible. For each Dth of such Gas that Shipper
shall not return to Transporter as expressly required pursuant
to this Section 3.4, Shipper shall be subject to a penalty rate
equal to twelve (12) times the sum of the maximum applicable FSS
Deliverability and Capacity Reservation Rates.
3.5 Overrun Service Charge. The applicable Overrun Service Rate
shall be paid for each Dekatherm of Gas which is injected or
withdrawn on behalf of Shipper during the Month pursuant to
Section 3.4 of this Rate Schedule unless such overrun service,
with Transporter's concurrence, is makeup of quantities of Gas
that Transporter previously failed to inject into storage or
withdraw from storage. The formula for calculating the
applicable Rate Schedule FSS Overrun Service Rate is stated on
Sheet No. 10 or 10A.
3.6 Fuel and Electric Power Cost Reimbursement. Shipper shall
furnish at the Point(s) of Injection/Withdrawal, for each
Dekatherm injected, the Transporter's Use and EPC Charge
utilizing the applicable Rate Schedule FSS Transporter's Use
(%) and EPC Charge set forth on Sheet No. 19 or 19A.