ANR Pipeline Company

Second Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 11/01/2006, Docket: RP06-613-000, Status: Effective

Third Revised Sheet No. 28 Third Revised Sheet No. 28 : Effective

Superseding: Substitute Second Revised Sheet No. 28

 

 

RATE SCHEDULE STS

Small Transportation Service

(Continued)

 

for each Dekatherm of Authorized Daily Overrun Quantity Gas that

exceeds the Swing Percentage shall be equal to the Charges set

forth in Sections 3.1 and 3.2, above.

 

3.4 Unauthorized Overrun Service.

 

(a) Each Dekatherm of Gas Delivered Hereunder to Shipper

pursuant to Section 14 of the General Terms and Conditions

of this Tariff on any Day, which is in excess of any of

Shipper's Rate Schedule STS MDQs, and which has not been

authorized under Section 3.3 of this Rate Schedule, shall be

considered as "Unauthorized Daily Overrun Quantity" and

shall be subject to a penalty rate equal to the greater of

ten dollars ($10.00) or two times the Spot Price Index for

the Service Month, as defined in Section 16 of the General

Terms and Conditions of this Tariff, in addition to all the

charges set forth in Section 3.3 above.

 

(b) Each Dekatherm of Gas Delivered Hereunder to Shipper as an

Unauthorized Daily Overrun Quantity at any time after

Transporter has issued an express order to Shipper to cease

and desist shall be subject to a penalty rate equal to

twelve (12) times the applicable maximum reservation rates

under Rate Schedule ETS, in addition to all of the charges

set forth in Sections 3.3 and 3.4(a), above.

 

3.5 Fuel and Electric Power Cost Reimbursement. Shipper shall furnish

at Receipt Point(s) the Gas for Transporter's Use, utilizing the

applicable Transporter's Use (%) set forth on Sheet No. 19 and, if

applicable Sheet No. 68H. Shipper shall also furnish at the Point

of Injection/Withdrawal, for each Dekatherm injected, the

applicable storage-related Transporter's Use (%) set forth on

Sheet No. 19. Shipper shall also pay to Transporter the applicable

EPC Charge as stated on Sheet No. 19A.

 

3.6 Cycling Fuel Charge. If a Shipper has renewed its Agreement for

the next Storage Contract Year under this Rate Schedule, or any

successor Rate Schedule, and fails to reduce its Working Storage

Gas to twenty percent (20%) or less of its Maximum Storage

Quantity by the end of the Winter Period, then Transporter shall

reduce Working Storage Gas for Cycling Fuel.