ANR Pipeline Company

Second Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 11/01/2006, Docket: RP06-613-000, Status: Effective

Seventh Revised Sheet No. 23 Seventh Revised Sheet No. 23 : Effective

Superseding: Sixth Revised Sheet No. 23

RATE SCHEDULE ETS

Enhanced Transportation Service

(Continued)

 

(b) Other Applicable Charges or Surcharges. All

applicable reservation and volumetric charges or

surcharges, including but not limited to those charges

under Sections 24 and 29 of the General Terms and

Conditions of this Tariff, for each Dekatherm of MDQ,

or Gas Delivered Hereunder, as applicable. Such

charges or surcharges are stated on Sheet Nos. 17 and

18.

 

3.3 Daily Scheduling Penalties. Only Shippers identified in

Section 14.1(a)(3)(iii) of the General Terms and Conditions

of this Tariff, may be subject to daily scheduling

penalties, and only on each Dekatherm of the quantities of

variance set forth therein that exceeds the Swing

Percentage. The rate for any such daily scheduling penalty

per Dekatherm shall be the highest applicable Rate Schedule

ITS Maximum Rate to that Delivery Point.

 

3.4 Authorized Overrun Service. Transporter may authorize

Shipper to take hereunder daily overrun quantities of Gas to

the extent that, in the sole judgment of Transporter, the

delivery capacity of Transporter's Pipeline System will

permit such delivery without jeopardizing the ability of

Transporter to meet all of its other firm service delivery

obligations. The term "Authorized Daily Overrun Quantity"

shall mean the quantity of Gas which is authorized and

delivered by Transporter during any one Day in excess of any

of Shipper's Delivery Point MDQs. Any request for service

under this Section 3.4 must be made by Shipper pursuant to a

separate nomination for Authorized Daily Overrun Quantity

Gas in accordance with Section 6.1(a) or 6.2(a) of the

General Terms and Conditions of this Tariff, provided,

however, a separate nomination is not required if the

overrun is being delivered under any service associated with

the operation of Transporter's Rate Schedule NNS or MBS and

has been authorized and allocated to Shipper pursuant to

Section 14.1(a)(1), 14.1(a)(3) or 14.1(c) of the General

Terms and Conditions of this Tariff. In addition to other

applicable charges, Shipper shall pay a commodity charge for

each Dekatherm of Authorized Daily Overrun Quantity equal to

(a) the applicable maximum Reservation Charges times 12 then

dividing the result by 365, plus (b) in the case of

utilization of any Secondary Receipt or Delivery Points, the

applicable incremental maximum Reservation Rate(s) set forth

in Section 3.1(c), above, times 12 then dividing the result

by 365.