STATEMENT OF BASE TRANSMISSION TARIFF RATES FOR TRANSPORTATION OF NATURAL GAS

EXCLUSIVE OF ADDITIONAL CHARGES OR SURCHARGES

 

 

MAXIMUM RATE PER DTH MAXIMUM

------------------------- DAILY CAPACITY

RESERVATION COMMODITY MINIMUM RELEASE RATE

RATE SCHEDULE AND TYPE OF SERVICE RATE RATE RATE PER DTH PER DTH

---------------------------------------- ----------- --------- ------------ -------------

(Col. 1) (Col. 2) (Col. 3) (Col. 4) (Col. 5)

 

RATE SCHEDULES FTS-1, FTS-4, FTS-4L, ETS (1)

AND PTS-2

-----------------------------------------------

1. Rate

a. Mainline - Access $2.750 $0.0060 $0.0060 $0.0904

b. Mainline - Southwest Southern Segment 1.500 0.0015 0.0015 0.0493

c. Mainline - Southwest Central Segment 1.500 0.0020 0.0020 0.0493

d. Mainline - Southeast Southern Segment 2.000 0.0025 0.0025 0.0658

e. Mainline - Southeast Central Segment 1.750 0.0020 0.0020 0.0575

f. Mainline - Northern Segment 1.500 0.0015 0.0015 0.0493

g. Southeast Area - Transmission (2) 1.750 0.0020 0.0020 0.0575

h. Southwest Area - Transmission (2) 2.000 0.0050 0.0050 0.0658

 

2. ETS Mainline Rate Increment (1) $0.608 $0.0000 $0.0000 $0.0200

 

3. Overrun Service Rate (3) (3) (3)

 

RATE SCHEDULE FTS-2

---------------------------------------------

1. Rate

a. Mainline - Access $1.808 $0.0370 $0.0060 $0.0594

b. Mainline - Southwest Southern Segment 0.986 0.0184 0.0015 0.0324

c. Mainline - Southwest Central Segment 0.986 0.0189 0.0020 0.0324

d. Mainline - Southeast Southern Segment 1.315 0.0250 0.0025 0.0432

e. Mainline - Southeast Central Segment 1.151 0.0217 0.0020 0.0378

f. Mainline - Northern Segment 0.986 0.0184 0.0015 0.0324

g. Southeast Area - Transmission 1.151 0.0217 0.0020 0.0378

h. Southwest Area - Transmission 1.315 0.0276 0.0050 0.0432

 

2. Overrun Service Rate (3) (3) (3)

 

(1) The ETS Mainline Access Rates (reservation and commodity) are equal to the

FTS-1 mainline access rates. The ETS Mainline Mileage reservation rate for

each segment is equal to the FTS-1 Mainline Mileage rate. For Rate

Schedule ETS an incremental reservation rate of $.608 is charged. The ETS

Mainline Mileage commodity rates for each segment are equal to the FTS-1

Mainline Mileage Commodity Rates. The ETS Rate Schedule is not available

in the Southeast and Southwest Areas.

 

(2) Rates applicable for service under Rate Schedule PTS-2.

 

(3) The Overrun Service Rate is a commodity charge for each Dekatherm of

Authorized Daily Overrun Quantity equal to (a) the applicable maximum

Reservation Charges times 12 then dividing the result by 365, plus (b) the

applicable Commodity Charges, plus (c) in the case of utilization of any

Secondary Receipt or Delivery Points outside of the Rate Segment(s) or

portions thereof for which capacity is reserved and paid for, the

applicable incremental maximum Reservation Rate(s) times 12 then dividing

the result by 365 plus the applicable incremental commodity charges, as

stated on Sheet Nos. 5, 7 or 8 (which ever is applicable) and/or 68G, that

Transporter would otherwise charge for transportation to or from those

additional Rate Segments, or portions thereof.