ANR Pipeline Company
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 11/01/2006, Docket: RP06-613-000, Status: Effective
Ninth Revised Sheet No. 12 Ninth Revised Sheet No. 12 : Effective
Superseding: Sub Eighth Revised Sheet No. 12
STATEMENT OF BASE TRANSMISSION TARIFF RATES FOR TRANSPORTATION OF NATURAL GAS
EXCLUSIVE OF ADDITIONAL CHARGES OR SURCHARGES
MAXIMUM RATE PER DTH MAXIMUM
------------------------- DAILY CAPACITY
RESERVATION COMMODITY MINIMUM RELEASE RATE
RATE SCHEDULE AND TYPE OF SERVICE RATE RATE RATE PER DTH PER DTH
---------------------------------------- ----------- --------- ------------ -------------
(Col. 1) (Col. 2) (Col. 3) (Col. 4) (Col. 5)
RATE SCHEDULES FTS-1, FTS-4, FTS-4L, ETS (1)
AND PTS-2
-----------------------------------------------
1. Rate
a. Mainline - Access $2.750 $0.0060 $0.0060 $0.0904
b. Mainline - Southwest Southern Segment 1.500 0.0015 0.0015 0.0493
c. Mainline - Southwest Central Segment 1.500 0.0020 0.0020 0.0493
d. Mainline - Southeast Southern Segment 2.000 0.0025 0.0025 0.0658
e. Mainline - Southeast Central Segment 1.750 0.0020 0.0020 0.0575
f. Mainline - Northern Segment 1.500 0.0015 0.0015 0.0493
g. Southeast Area - Transmission (2) 1.750 0.0020 0.0020 0.0575
h. Southwest Area - Transmission (2) 2.000 0.0050 0.0050 0.0658
2. ETS Mainline Rate Increment (1) $0.608 $0.0000 $0.0000 $0.0200
3. Overrun Service Rate (3) (3) (3)
RATE SCHEDULE FTS-2
---------------------------------------------
1. Rate
a. Mainline - Access $1.808 $0.0370 $0.0060 $0.0594
b. Mainline - Southwest Southern Segment 0.986 0.0184 0.0015 0.0324
c. Mainline - Southwest Central Segment 0.986 0.0189 0.0020 0.0324
d. Mainline - Southeast Southern Segment 1.315 0.0250 0.0025 0.0432
e. Mainline - Southeast Central Segment 1.151 0.0217 0.0020 0.0378
f. Mainline - Northern Segment 0.986 0.0184 0.0015 0.0324
g. Southeast Area - Transmission 1.151 0.0217 0.0020 0.0378
h. Southwest Area - Transmission 1.315 0.0276 0.0050 0.0432
2. Overrun Service Rate (3) (3) (3)
(1) The ETS Mainline Access Rates (reservation and commodity) are equal to the
FTS-1 mainline access rates. The ETS Mainline Mileage reservation rate for
each segment is equal to the FTS-1 Mainline Mileage rate. For Rate
Schedule ETS an incremental reservation rate of $.608 is charged. The ETS
Mainline Mileage commodity rates for each segment are equal to the FTS-1
Mainline Mileage Commodity Rates. The ETS Rate Schedule is not available
in the Southeast and Southwest Areas.
(2) Rates applicable for service under Rate Schedule PTS-2.
(3) The Overrun Service Rate is a commodity charge for each Dekatherm of
Authorized Daily Overrun Quantity equal to (a) the applicable maximum
Reservation Charges times 12 then dividing the result by 365, plus (b) the
applicable Commodity Charges, plus (c) in the case of utilization of any
Secondary Receipt or Delivery Points outside of the Rate Segment(s) or
portions thereof for which capacity is reserved and paid for, the
applicable incremental maximum Reservation Rate(s) times 12 then dividing
the result by 365 plus the applicable incremental commodity charges, as
stated on Sheet Nos. 5, 7 or 8 (which ever is applicable) and/or 68G, that
Transporter would otherwise charge for transportation to or from those
additional Rate Segments, or portions thereof.