ANR Pipeline Company

Second Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 08/01/2010, Docket: RP10-977-000, Status: Effective

Fourth Revised Sheet No. 10A Fourth Revised Sheet No. 10A

Superseding: Third Revised Sheet No. 10A

 

RATE SCHEDULE FSS

RESERVATION AND COMMODITY CHARGES

FIRM STORAGE SERVICE 1/ 3/

 

APPLICABLE TO CUSTOMERS UTILIZING CAPACITY PURSUANT TO INCREMENTAL FACILITY EXPANSIONS:

 

Docket No. CP06-464 (Cold Springs 1 Storage Project):

-----------------------------------------------------

Maximum

Maximum Minimum Daily Capacity

Rate per Dth Rate per Dth Release Rate per Dth

------------ ------------- --------------------

With Ratchets and Seasonal Entitlements

---------------------------------------

1. Reservation Rate

a. Deliverability Rate $ 2.28 $ 0 $ 0.0750

b. Capacity Rate $ .4818 $ 0 $ 0.0013

2. Commodity Rate

Injection/Withdrawal $ 0.0126 $ 0.0126

3. Overrun Service Rate 2/ $ 0.0126

 

With Ratchets and Flexible Entitlements

---------------------------------------

1. Reservation Rate

a. Deliverability Rate $ 2.68 $ 0 $ 0.0881

b. Capacity Rate $ .4818 $ 0 $ 0.0013

2. Commodity Rate

Injection/Withdrawal $ 0.0126 $ 0.0126

3. Overrun Service Rate 2/ $ 0.0126

 

Without Ratchets and Seasonal Entitlements

------------------------------------------

1. Reservation Rate

a. Deliverability Rate $ 2.85 $ 0 $ 0.0937

b. Capacity Rate $ .4818 $ 0 $ 0.0013

2. Commodity Rate

Injection/Withdrawal $ 0.0126 $ 0.0126

3. Overrun Service Rate 2/ $ 0.0126

 

Without Ratchets and Flexible Entitlements

------------------------------------------

1. Reservation Rate

a. Deliverability Rate $ 3.25 $ 0 $ 0.1068

b. Capacity Rate $ .4818 $ 0 $ 0.0013

2. Commodity Rate

Injection/Withdrawal $ 0.0126 $ 0.0126

3. Overrun Service Rate 2/ $ 0.0126

 

RATE SCHEDULE DDS 1/

---------------------

1. Storage Commodity Rate $ .0993 $ 0.0126

 

 

1/ The rates shown are subject to all applicable reservation and volumetric charges or

surcharges under Section 24 of the General Terms and Conditions of this Tariff. Sheet

No. 17 reflects the applicable charges and surcharges under this Section.

2/ 100% load factor rate, which is the sum of (a) the product of (1) the Deliverability

Reservation Rate, (2) twelve, and (3) the Base Maximum Daily Withdrawal Quantity divided

by the Maximum Storage Quantity, (b) the Capacity Reservation Rate and (c) the

Injection/Withdrawal Commodity Rate.

3/ Applicable Transporter's Use (%) and EPC Charge for Rate Schedule FSS are stated on Sheet

No. 19 and 19A.