ANR Pipeline Company
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 08/01/2010, Docket: RP10-977-000, Status: Effective
Fourth Revised Sheet No. 10A Fourth Revised Sheet No. 10A
Superseding: Third Revised Sheet No. 10A
RATE SCHEDULE FSS
RESERVATION AND COMMODITY CHARGES
FIRM STORAGE SERVICE 1/ 3/
APPLICABLE TO CUSTOMERS UTILIZING CAPACITY PURSUANT TO INCREMENTAL FACILITY EXPANSIONS:
Docket No. CP06-464 (Cold Springs 1 Storage Project):
-----------------------------------------------------
Maximum
Maximum Minimum Daily Capacity
Rate per Dth Rate per Dth Release Rate per Dth
------------ ------------- --------------------
With Ratchets and Seasonal Entitlements
---------------------------------------
1. Reservation Rate
a. Deliverability Rate $ 2.28 $ 0 $ 0.0750
b. Capacity Rate $ .4818 $ 0 $ 0.0013
2. Commodity Rate
Injection/Withdrawal $ 0.0126 $ 0.0126
3. Overrun Service Rate 2/ $ 0.0126
With Ratchets and Flexible Entitlements
---------------------------------------
1. Reservation Rate
a. Deliverability Rate $ 2.68 $ 0 $ 0.0881
b. Capacity Rate $ .4818 $ 0 $ 0.0013
2. Commodity Rate
Injection/Withdrawal $ 0.0126 $ 0.0126
3. Overrun Service Rate 2/ $ 0.0126
Without Ratchets and Seasonal Entitlements
------------------------------------------
1. Reservation Rate
a. Deliverability Rate $ 2.85 $ 0 $ 0.0937
b. Capacity Rate $ .4818 $ 0 $ 0.0013
2. Commodity Rate
Injection/Withdrawal $ 0.0126 $ 0.0126
3. Overrun Service Rate 2/ $ 0.0126
Without Ratchets and Flexible Entitlements
------------------------------------------
1. Reservation Rate
a. Deliverability Rate $ 3.25 $ 0 $ 0.1068
b. Capacity Rate $ .4818 $ 0 $ 0.0013
2. Commodity Rate
Injection/Withdrawal $ 0.0126 $ 0.0126
3. Overrun Service Rate 2/ $ 0.0126
RATE SCHEDULE DDS 1/
---------------------
1. Storage Commodity Rate $ .0993 $ 0.0126
1/ The rates shown are subject to all applicable reservation and volumetric charges or
surcharges under Section 24 of the General Terms and Conditions of this Tariff. Sheet
No. 17 reflects the applicable charges and surcharges under this Section.
2/ 100% load factor rate, which is the sum of (a) the product of (1) the Deliverability
Reservation Rate, (2) twelve, and (3) the Base Maximum Daily Withdrawal Quantity divided
by the Maximum Storage Quantity, (b) the Capacity Reservation Rate and (c) the
Injection/Withdrawal Commodity Rate.
3/ Applicable Transporter's Use (%) and EPC Charge for Rate Schedule FSS are stated on Sheet
No. 19 and 19A.