ANR Pipeline Company
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 11/01/2006, Docket: RP06-613-000, Status: Effective
Eleventh Revised Sheet No. 10 Eleventh Revised Sheet No. 10 : Effective
Superseding: Tenth Revised Sheet No. 10
STATEMENT OF RATES FOR STORAGE OF NATURAL GAS
RATE SCHEDULE FSS 1/
Maximum
Maximum Minimum Daily Capacity
Rate per Dth Rate per Dth Release Rate per Dth
With Ratchets and Seasonal Entitlements ------------ ------------- --------------------
---------------------------------------
1. Reservation Rate
a. Deliverability Rate $ 2.04 $ 0 $ 0.0671
b. Capacity Rate $ .4000 $ 0 $ 0.0011
2. Commodity Rate
Injection/Withdrawal $ 0.0126 $ 0.0126
3. Overrun Service Rate 2/ $ 0.0126
With Ratchets and Flexible Entitlements
---------------------------------------
1. Reservation Rate
a. Deliverability Rate $ 2.45 $ 0 $ 0.0805
b. Capacity Rate $ .4000 $ 0 $ 0.0011
2. Commodity Rate
Injection/Withdrawal $ 0.0126 $ 0.0126
3. Overrun Service Rate 2/ $ 0.0126
Without Ratchets and Seasonal Entitlements
------------------------------------------
1. Reservation Rate
a. Deliverability Rate $ 2.60 $ 0 $ 0.0855
b. Capacity Rate $ .4000 $ 0 $ 0.0011
2. Commodity Rate
Injection/Withdrawal $ 0.0126 $ 0.0126
3. Overrun Service Rate 2/ $ 0.0126
Without Ratchets and Flexible Entitlements
----------------------------------------
1. Reservation Rate
a. Deliverability Rate $ 3.00 $ 0 $ 0.0986
b. Capacity Rate $ .4000 $ 0 $ 0.0011
2. Commodity Rate
Injection/Withdrawal $ 0.0126 $ 0.0126
3. Overrun Service Rate 2/ $ 0.0126
RATE SCHEDULE DDS 3/
-----------------
1. Storage Commodity Rate $ .0874 $ 0.0126
1/ The rates shown are subject to all applicable reservation and volumetric charges or
surcharges, under Sections 24 and 29 of the General Terms and Conditions of this Tariff.
Sheets No. 17 reflects the applicable charges and surcharges under these Sections.
2/ 100% load factor rate, which is the sum of (a) the product of (1) the Deliverability
Reservation Rate, (2) twelve, and (3) the Base Maximum Daily Withdrawal Quantity divided
by the Maximum Storage Quantity, (b) the Capacity Reservation Rate and (c) the
Injection/Withdrawal Commodity Rate.
3/ The rates shown are subject to all applicable volumetric charges or surcharges, under
Sections 24 and 29 of the General Terms and Conditions of this Tariff. Sheet No. 17
reflects the applicable charges and surcharges under these Sections.