STATEMENT OF RATES FOR STORAGE OF NATURAL GAS

RATE SCHEDULE FSS 1/

 

Maximum

Maximum Minimum Daily Capacity

Rate per Dth Rate per Dth Release Rate per Dth

With Ratchets and Seasonal Entitlements ------------ ------------- --------------------

---------------------------------------

1. Reservation Rate

a. Deliverability Rate $ 2.04 $ 0 $ 0.0671

b. Capacity Rate $ .4000 $ 0 $ 0.0011

2. Commodity Rate

Injection/Withdrawal $ 0.0126 $ 0.0126

3. Overrun Service Rate 2/ $ 0.0126

 

With Ratchets and Flexible Entitlements

---------------------------------------

1. Reservation Rate

a. Deliverability Rate $ 2.45 $ 0 $ 0.0805

b. Capacity Rate $ .4000 $ 0 $ 0.0011

2. Commodity Rate

Injection/Withdrawal $ 0.0126 $ 0.0126

3. Overrun Service Rate 2/ $ 0.0126

 

Without Ratchets and Seasonal Entitlements

------------------------------------------

1. Reservation Rate

a. Deliverability Rate $ 2.60 $ 0 $ 0.0855

b. Capacity Rate $ .4000 $ 0 $ 0.0011

2. Commodity Rate

Injection/Withdrawal $ 0.0126 $ 0.0126

3. Overrun Service Rate 2/ $ 0.0126

 

Without Ratchets and Flexible Entitlements

----------------------------------------

1. Reservation Rate

a. Deliverability Rate $ 3.00 $ 0 $ 0.0986

b. Capacity Rate $ .4000 $ 0 $ 0.0011

2. Commodity Rate

Injection/Withdrawal $ 0.0126 $ 0.0126

3. Overrun Service Rate 2/ $ 0.0126

 

RATE SCHEDULE DDS 3/

-----------------

1. Storage Commodity Rate $ .0874 $ 0.0126

 

 

 

 

1/ The rates shown are subject to all applicable reservation and volumetric charges or

surcharges, under Sections 24 and 29 of the General Terms and Conditions of this Tariff.

Sheets No. 17 reflects the applicable charges and surcharges under these Sections.

 

2/ 100% load factor rate, which is the sum of (a) the product of (1) the Deliverability

Reservation Rate, (2) twelve, and (3) the Base Maximum Daily Withdrawal Quantity divided

by the Maximum Storage Quantity, (b) the Capacity Reservation Rate and (c) the

Injection/Withdrawal Commodity Rate.

 

3/ The rates shown are subject to all applicable volumetric charges or surcharges, under

Sections 24 and 29 of the General Terms and Conditions of this Tariff. Sheet No. 17