ANR Pipeline Company
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/01/2009, Docket: RP10-52-000, Status: Effective
Original Sheet No. 7A Original Sheet No. 7A
RATE SCHEDULES FTS-1 & ETS
RESERVATION AND COMMODITY CHARGES
FIRM TRANSPORTATION SERVICES
WISCONSIN 2009 PROJECT
Docket No. CP08-465
Applicable to Customers Utilizing Capacity Pursuant to Incremental Facility
Expansion
MATRIX OF BASE TARIFF TRANSMISSION RATES PER DTH BY SERVICE TYPE
RATE SCHEDULE FTS-1 RATE
Reservation (Res) $6.2020
Commodity (Comm) 0.0075
Minimum (MIN) 0.0075
Overrun (Ovrn) 0.2114
RATE SCHEDULE ETS RATE
Reservation (Res) $6.8100
Commodity (Comm) 0.0075
Minimum (MIN) 0.0075
Overrun (Ovrn) 0.2314
General Notes:
Rates shown above are applicable to transportation services authorized in
Docket No. CP08-465, Wisconsin 2009 Expansion Project, under contract id(s)
114489, 114492, 114498, 114499, 114500, 114501, 114502, 114503, 114504,
114505, 114512, 114667 and 114677. The total rate charged for the incremental
service provided under these contracts shall equal the Reservation and
Commodity rates as reflected above. Shippers moving gas outside their primary
path as defined in the respective contract, but within ML-7, are subject to
the full ML-7 rate as an add-on for recourse rate purposes. The rates
represent maximum rates unless designated as minimum firm service rates (MIN).
These rates also apply to any superseding or superseded service.
Interruptible service shall be charged the applicable Rate Schedule ITS rate
as set forth on Sheet No. 9.
These services shall be charged the applicable Transporter's Use and EPC
Charge.
The rates shown are subject to all applicable reservation and volumetric
charges or surcharges, under Section 24 of the General Terms and Conditions of
this Tariff. Sheet No. 17 reflects the applicable charges and surcharges
under this Section.