Millennium Pipeline Company, L. L. C.

Original Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 12/22/2008, Docket: CP98-150-011, Status: Effective

Original Sheet No. 205 Original Sheet No. 205

 

GENERAL TERMS AND CONDITIONS

(Continued)

 

(e) In the event Shipper does not provide the sworn statement as

required by this Section 16.5, or receives emergency relief on the basis of

any representation in such sworn statement that is determined to have been

materially false, then all of the quantities attributable to the adjustment

made by Transporter shall be billed to that Shipper, in addition to all other

charges, at a rate of $25 per dekatherm. All revenues attributable to such

$25 per dekatherm charge shall be credited, on a pro rata basis, to those

Shippers interrupted to a lower quantity as a result of the anticipated sworn

statement.

 

(f) To the extent Transporter's interruption of any Shipper

pursuant to this Section 16.5 would cause such Shipper to incur a penalty due

Transporter through no fault of Shipper, Transporter shall not assess that

penalty against that Shipper. This provision does not excuse Shipper from

taking all reasonable action necessary to remove itself from a penalty

situation.

 

(g) In the event emergency relief is provided pursuant to this

Section 16.5, Transporter shall post on its EBB the following information

within two hours after such relief has been granted: (1) the name of the

Shipper(s) whose request(s) for emergency relief have been granted; (2) the

date and the time when the emergency relief was initiated to the Shipper(s);

(3) the expected duration of the emergency; (4) the specific location of the

emergency; and (5) a brief description of the nature of the capacity

constraint and the emergency.

 

(h) Transporter will maintain, and make available for inspection

by any interested party, all written and electronic information generated in

connection with the granting or denial of emergency relief pursuant to this

Section 16.5, including but not limited to the sworn statement and facsimile

transmissions required by Section 16.5(b), and the EBB notice required by

Section 16.5(g).

 

16.6 Interruptions Due To Upstream Or Downstream Facilities.

 

In instances in which an interruption on Transporter is necessitated

by an interruption of service on an upstream or downstream facility and

Transporter can identify the specific shipper on Transporter's system whose

upstream or downstream service is interrupted, Transporter will interrupt

such specific Shipper.