Gulfstream Natural Gas System, L.L.C.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 07/01/2003, Docket: RP03-439-000, Status: Effective
Second Revised Sheet No. 179 Second Revised Sheet No. 179 : Effective
Superseding: First Revised Sheet No. 179
GENERAL TERMS AND CONDITIONS
(CONTINUED)
(9) The legal name of the Replacement Shipper that
is designated in any pre-arranged release
("Pre-arranged Replacement Shipper").
(10) Whether the capacity is to be released on a
recallable basis, and, if so, (i) the terms and
conditions of such recall, including whether it
is recallable on a full day or a partial day
basis, (ii) whether the Releasing Shipper's
recall notification must be provided
exclusively on a Business Day, (iii) which
recall notification period(s), as identified in
Section 26.1(d) above, will be available for
use by the parties, and (iv) whether the
Releasing Shipper is authorized to Reput the
release if and when it notifies Transporter
that the recall is no longer in effect; or
whether the capacity is to be released on a
permanent basis.
(11) Whether the capacity to be released is
contingent on the release of other capacity, or
on certain terms and conditions, and if so, the
capacity, terms and/or conditions upon which
the release is contingent.
(12) The terms and conditions under which Releasing
Shipper will accept contingent bids, including
bids that are contingent upon the Replacement
Shipper acquiring transportation on a pipeline
interconnected to Transporter, the method for
evaluating contingent bids, what level of proof
is required by the contingent bidder to
demonstrate that the contingency did not occur,
and for what time period the next highest
bidder will be obligated to acquire the
capacity if the next winning contingent bidder
declines the release.