Gulfstream Natural Gas System, L.L.C.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/28/2010, Docket: RP10-792-000, Status: Effective
Third Revised Sheet No. 178 Third Revised Sheet No. 178
Superseding: Second Revised Sheet No. 178
GENERAL TERMS AND CONDITIONS
(CONTINUED)
(2) Whether the capacity is biddable.
(3) The level of daily firm entitlements that the
Releasing Shipper elects to release, expressed
as a numeric quantity per Day for
transportation, which will be displayed in the
1LineSM posting for prospective Replacement
Shippers as the available MDQ and associated
MHQ.
(4) The Primary Route(s) or segment within such
Primary Route(s), and quantity to be released.
(5) The requested effective date and the term of
the release.
(6) The minimum acceptable period of release and
minimum acceptable quantities (if any).
(7) The Releasing Shipper's maximum reservation
rates (including any demand type surcharges,
direct bills, or similar mechanisms), any
minimum rate requirement, whether bids are to
be submitted on a reservation or volumetric
basis, and whether the bids should be stated in
dollars and cents or percent of the maximum
tariff rate. The maximum and minimum rates may
separately identify surcharges and direct
bills, or such amounts can be included in the
total rate. For purposes of this Section 26,
the maximum reservation rate(s) for Shipper
paying a negotiated rate will be deemed to be
the maximum rate(s) as set forth on the
Statement of Capacity Release Rates. For
releases that become effective on or after July
30, 2008, any maximum and/or minimum rate
specified by the Releasing Shipper can exceed
the maximum tariff rate for the applicable
service if (i) the term of the proposed release
is one (1) year or less, and (ii) the effective
date of the proposed release is on or before
one (1) year from the date on which Transporter
is notified of the release.
(8) Whether the Releasing Shipper is requesting
that Transporter actively market the capacity
to be released.