Gulfstream Natural Gas System, L.L.C.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 05/21/2002, Docket: CP00- 6-004, Status: Effective
Original Sheet No. 154 Original Sheet No. 154 : Effective
GENERAL TERMS AND CONDITIONS
(CONTINUED)
13.7 Operational Flow Orders: In the event that (1)
Shipper/point operator does not respond to an Action Alert,
or (2) the actions taken thereunder are insufficient to
correct the system problem for which the Action Alert was
issued, or (3) there is insufficient time to carry out the
procedures with respect to Action Alerts, Transporter may
periodically take unilateral action, including the
curtailment of firm Transportation Service, to maintain the
operational integrity of Transporter's system (or any
portion thereof). For purposes of this Section 13.7, the
operational integrity of Transporter's system shall
encompass the integrity of the physical system and the
preservation of physical assets and their performance, the
overall operating performance of the entire physical system
(or any portion thereof), and the maintenance (on a reliable
and operationally sound basis) of total system
deliverability and the quality of Gas delivered. Notice of
an Operational Flow Order will be provided pursuant to and
in accordance with Section 13.5 above.
13.8 Penalties: If a Shipper/point operator fails to comply with
an Action Alert or Operational Flow Order, the Shipper/point
operator shall be subject to a penalty as follows:
Action Alert penalty for each Dekatherm of Gas by which
Shipper/point operator deviated from the requirements of the
Action Alert equal to the product of 200% times the "Florida
Gates via FGT", "High Common" price published in "Platts Gas
Daily" "Daily Price Survey", for each Day that said Action
Alert is in effect.
Operational Flow Order penalty for each Dekatherm of Gas by
which Shipper/point operator deviated from the requirements
of the Operational Flow Order equal to the product of 500%
times the "Florida Gates via FGT", "High Common" price
published in "Platts Gas Daily" "Daily Price Survey", for
each Day that said Operational Flow Order is in effect.
Any penalty revenues received by Transporter as a result of
the operation of Section 13.8 above will be credited
pursuant to Section 24.4 of the General Terms and
Conditions.