Gulfstream Natural Gas System, L.L.C.

Original Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 05/24/2010, Docket: RP10-630-000, Status: Effective

First Revised Sheet No. 132 First Revised Sheet No. 132

Superseding: Original Sheet No. 132

 

GENERAL TERMS AND CONDITIONS

(CONTINUED)

 

 

7. DETERMINATION OF DAILY ALLOCATED RECEIPTS AND DELIVERIES

 

7.1 Allocation of Receipts/Deliveries. Unless an OBA is in

effect, or unless Transporter and Operator mutually agree

to allocate deliveries each Day using ranked, pro rata,

percentage, swing or operator provided value methodologies,

such deliveries will be allocated through the meter pro

rata, to the extent applicable, based on confirmed

nominations.

 

Operator shall notify Transporter via 1LineSM after or

during confirmation and before the end of the Service Day,

that it desires to establish allocation priorities at

Receipt and/or Delivery Points using any of the following

methodologies: ranked, pro rata, percentage, swing or

Operator provided value provided, however, Transporter will

not be required to agree to any of such allocation

methodologies if they are operationally or administratively

infeasible.

 

Transporter shall advise such Operator of the confirmed

nominations at such Receipt/Delivery Point.

 

The Operator shall establish an allocation priority for

over and under production at the level of detail that the

confirmed nominations are provided, and advise Transporter

of such priorities via 1LineSM before the end of the Day.

Any confirmed nominations that do not have established

allocation priorities shall be considered as having the

highest priority: