Gulfstream Natural Gas System, L.L.C.

Original Volume No. 1

 Contents / Previous / Next / Main Tariff Index



Effective Date: 05/01/2003, Docket: RP03-173-000, Status: Effective

First Revised Sheet No. 128 First Revised Sheet No. 128 : Superseded

Superseding: Original Sheet No. 128







5.2 For each nomination cycle, Transporter shall allocate

capacity on the basis of nominations made by Shippers,

utilizing the priorities of service, from highest to

lowest, as set forth below:


(a) Priority Class One. Rate Schedule FTS Primary Receipt

Point(s) and Primary Delivery Point(s) within MDQ and

within MHQ.


(b) Priority Class Two. Rate Schedule FTS. Secondary

Receipt or Delivery Point(s) within MDQ within the

Primary Route.


(c) Priority Class Three. Rate Schedule FTS. Secondary

Receipt Point(s) or Delivery Points(s) within MDQ

outside the Primary Route.


(d) Priority Class Four. Rate Schedule ITS, Rate Schedule



(e) Priority Class Five. Interruptible hourly flow

quantities pursuant to Section 14 of the General

Terms and Conditions.


(f) Priority Class Six. Make-up Gas scheduled at

Transporter's discretion.


For purposes of determining whether points are within the

Primary Route, a transaction from a Receipt Point to a

Delivery Point which is counter to the Gas flow

contemplated by the Primary Receipt Point and Primary

Delivery Point shall be considered as being outside the

Primary Route.