Kern River Gas Transmission Company
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 07/30/2008, Docket: RP09-306-000, Status: Effective
Sixth Revised Sheet No. 144 Sixth Revised Sheet No. 144
Superseding: Fifth Revised Sheet No. 144
. GENERAL TERMS AND CONDITIONS .
(Continued)
15. CAPACITY RELEASE PROGRAM (Continued)
15.3 Releases Permitted Without Prior Posting and Bidding. (Continued)
(b) Maximum Rate Long-Term Releases to Prearranged Bidder:
Prior posting and bidding pursuant to the procedures set
forth in this Section 15 will not be required for releases
of more than one year if the Releasing Shipper has provided
to Transporter the information required by Section 15.2(l)
regarding a Prearranged Bidder which has agreed to pay a
Total Release Reservation Charge which is equal to
Transporter's combined respective maximum Daily Reservation
Rate and any and all other maximum reservation charges and
surcharges applicable to the rate schedule governing the
Transportation rights to be released (the "Governing Rate
Schedule"), or the one-part volumetric equivalent thereof,
as may be revised from time to time (individually, the
"Tariff Reservation Rate" and the "Tariff Reservation
Surcharges," and collectively, the "Total Tariff Reservation
Charge"). In the event the Releasing Shipper elects to
release its Transportation rights under this Section 15.3(b)
without prior posting and bidding, then Transporter will
post the terms and conditions of any Release under this
Section 15.3(b) and the identity of the Prearranged Bidder
on its Designated Site no later than 9:00 a.m. CCT.
(c) Release to an Asset Manager: Prior posting and bidding
pursuant to the procedures set forth in this Section 15 will
not be required for any pre-arranged release to an asset
manager, defined as a release that contains the condition
that the Releasing Shipper may call upon the Replacement
Shipper to deliver to, or purchase from, the Releasing
Shipper a volume of gas up to 100 percent of the daily
contract demand of the released transportation according to
the following schedule:
(1) If the capacity release is for a period of one year or
less, the asset manager's delivery or purchase
obligation must apply on any day during a minimum
period of the lesser of five months (or 155 days) or
the term of the release.