Second Revised Sheet No. 131 Second Revised Sheet No. 131
Superseding: First Revised Sheet No. 131
. GENERAL TERMS AND CONDITIONS .
(Continued)
13. SCHEDULING OF RECEIPTS AND DELIVERIES (Continued)
13.4 Allocation of Receipts. (Continued)
(b) In the absence of a methodology set forth in 13.4(a),
Shipper will cause the Interconnect Operator at the Receipt
Point to notify Transporter of the pre-determined allocation
("PDA") methodology to be utilized in determining actual
receipts among all Shippers scheduled to receive service at
the Receipt Point. Such notification may be submitted
electronically to Transporter's Designated Site or, if
mutually agreed between Transporter and Interconnect
Operator, by other modes of communication. NAESB WGQ 2.3.5:
"The upstream or downstream party providing the point
confirmation should submit the pre-determined allocation to
the allocating party after or during confirmation and before
start of gas day." Such PDA will be effective for the term
specified in the PDA agreement, provided that the term may
not cover a period of less than one Day. The chosen
methodology must allocate receipts, to the maximum extent
possible, based upon confirmed nominations.
(c) In the absence of methodology set forth in 13.4 (a) or (b)
above, Transporter will rely on its default methodology of
allocating quantities to all Shippers. NAESB WGQ 2.3.18:
"The types of allocation methodologies is a list from which
two parties may agree. If the two parties cannot agree upon
an allocation methodology, pro rata based upon confirmed
nominations should be used as the default method. The party
responsible for custody transfer (the party performing the
measurement function) should provide the allocation."