Kern River Gas Transmission Company
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 01/01/2010, Docket: RP10-210-000, Status: Effective
Fifth Revised Sheet No. 110B Fifth Revised Sheet No. 110B
Superseding: Fourth Revised Sheet No. 110B
. .
GENERAL TERMS AND CONDITIONS
(Continued)
12. REIMBURSEMENT OF FUEL USED AND LOST AND UNACCOUNTED-FOR GAS (Continued)
12.12 Electric Compressor Fuel Surcharge. (Continued)
(1) Transporter will determine the electric compressor
fuel surcharge for rolled-in rate service beginning
April 1, 2003, using the following formula:
W = (X + Y)/ Z, where:
W = Electric Compressor Fuel Surcharge for Rolled-In
Rate Service
X = Transporter's share of the electricity costs for
the Daggett compressor projected for the twelve
months beginning April 1 of the current year
attributable to rolled-in rate service
Y = The amount, positive or negative, remaining in
the Electric Compressor Fuel Deferral Account at
the end of the previous calendar year
attributable to rolled-in rate service.
Z = Quantities of gas projected to flow on
Transporter's system through the Daggett
interconnect for the twelve months beginning
April 1 of the current year attributable to
rolled-in rate service.
(2) Transporter will determine an electric compressor fuel
surcharge for incremental rate service using the same
method as used for the rolled-in rate service.
(3) The electric compressor fuel surcharge for
interruptible and authorized overrun service will be a
blended rate derived from the surcharges applicable to
rolled-in rate service and incremental rate service on
the 2003 Expansion, calculated on the basis of 48% for
rolled-in service and 52% for incremental service.
Effective on the in-service date of the 2010
Expansion, the blended rate will be derived from the
surcharges applicable to rolled-in rate service and
incremental rate service on the 2003/2010 Expansions,
calculated on the basis of 45% for rolled-in service
and 55% for incremental service.