Kern River Gas Transmission Company

Second Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 08/01/2009, Docket: RP09-723-000, Status: Effective

First Revised Sheet No. 83 First Revised Sheet No. 83

Superseding: Original Sheet No. 83

 

. GENERAL TERMS AND CONDITIONS .

(Continued)

 

3. MEASURING EQUIPMENT (Continued)

 

3.6 Correction of Stated Metered Volumes. NAESB WGQ 2.3.14:

"Measurement data corrections should be processed within 6 months

of the production month with a 3 month rebuttal period. This

standard will not apply in the case of deliberate omission or

misrepresentation or mutual mistake of fact. Parties' other

statutory or contractual rights will not otherwise be diminished

by this standard."

 

3.7 Failure of Meters. In the event a meter is out of service or

registering inaccurately, the Volume of Gas delivered will be

determined:

 

(a) By correcting the error if the percentage of error is

ascertainable by calibration, tests or mathematical

calculation; or, in the absence of (a), then

 

(b) By estimating the Quantity of delivery by deliveries during

the periods under similar conditions when the meter was

registering accurately; or, in the absence of both (a) and

(b), then

 

(c) By using the registration of any check meter or meters if

installed and accurately registering.

 

3.8 Specific Gravity. The specific gravity of Gas flowing through the

meters will be determined by means of a gas chromatograph located

at Transporter's measuring station or at any other point on

Transporter's system.

 

3.9 Flowing Temperature. The flowing temperature of the Gas being

metered will be determined by means of a recording thermometer of

a type acceptable to both parties, installed and maintained in

accordance with the specifications set forth in the Gas

Measurement Committee Report No. 3, prepared by the Gas

Measurement Committee of the American Gas Association, dated

September, 1985, or any subsequent revision.