GENERAL TERMS AND CONDITIONS (Continued)

 

(vii) If deliveries are to be into a pool on the

Columbia Gas Transmission system, the identity of

the pool operator and verification that the pool

operator will be responsible for any imbalances;

 

(viii) The portion of the nominated quantities

designated for imbalance correction purposes;

 

(ix) Whether the nomination will roll over after the

end of the Nomination Period; and

 

(x) Any business-conditional and/or mutually-

agreeable data elements which may be needed for

the Pipeline to perform the service and satisfy

the other operational constraints on its system.

 

13.2 Intra-Day Nominations

 

The Customer shall have the right to submit an intra-day

nomination prior to gas flow to revise its scheduled quantities,

point(s) of receipt, and/or point(s) of delivery on a prospective

basis. Such intra-day nomination shall only be implemented to

the extent that the Pipeline is able to confirm the receipt and

delivery of such gas. There are two intra-day nomination cycles:

(i) intra-day nomination 1 cycle, a nomination must leave the

control of the Customer either through the Pipeline's electronic

communications system, EDI, or via facsimile no later than

10:00 a.m. CCT to be received by the Pipeline by 10:15 a.m.

CCT on the same day of gas flow to be effective at 5:00 p.m. CCT

that same day. The Pipeline will provide a quick response by

10:30 a.m. CCT, and (ii) intra-day nomination 2 cycle, a

nomination must leave the control of the Customer no later than

5:00 p.m. CCT to be received by the Pipeline by 5:15 p.m. CCT on

the same day of gas flow to be effective 9:00 p.m. CCT that same

day. The Pipeline will provide a quick response by 5:30 p.m. CCT.

Intra-day nominations may be used to nominate new supply or

market. An intra-day nomination shall specify Customer's service

requirement for one day only and shall include the effective date

and time. Intra-day nominations do not replace the remainder of a

standing nomination. There is no need to re-nominate if intra-day

nomination modifies existing nomination. There is no limitation

as to the number of intra-day nominations which a Customer may

submit at any one standard nomination cycle or in total across all

standard nomination cycles. The Pipeline may limit the Customer to

one transmittal of nominations per standard intra-day nomination